Laserfiche WebLink
C. Contractors — The Developer shall select, retain and supervise the <br />Contractor(s) responsible for the cgnstruction of the Improvements. The <br />City reserves the right to require satisfactory proof of successful <br />experience and adequate financial status of any such contractor. Where <br />required by City ordinance, the contractor shall first obtain a license from <br />the City. <br />D. Pre -Construction Conference —Prior to the start of any construction, the <br />Developer and the Developer's contractor shall meet with the responsible <br />City official to review construction plans and schedules. <br />E. Permits --Prior to tea of any construction, the Developer's contractor <br />shall apply for and receive all necessary permits from the City and/or <br />government agencies having jurisdiction. <br />I <br />F. Construction — The construction, installation and materials shall be in <br />accordance with the plans and specifications approved by the City. <br />G. Insurance —The Developer will cause each person who constructs and <br />installs any Improvements to maintain complete insurance coverage <br />including Workmen's Compensation, Liability and Property Damage. <br />5. Performance Security. For the purposes of assuring to the City that the <br />Improvements will be completed according to the terms of this Agreement, and <br />that the Developer will pay all claims for work done and materials and supplies <br />furnished, the Developer or its general contractor will deposit with the City prior <br />to issuance of site grading and building permits an irrevocable Letter of Credit <br />(LOC) from a local (Twin Cities area) financial institution in a form satisfactory <br />to the City, providing that the City is able to draw upon such letter of credit in its <br />sole discretion to complete the Improvements if the Developer fails to <br />satisfactorily complete the work prior to the completion date specified in Section <br />Four (4) above. Further, if the required Improvements are not completed at least <br />30 days prior to the expiration of the LOC, the City may also draw on the LOC. <br />If the security is drawn down, the draw shall be used to cure the default. <br />The amount of the LOC shall be 150% of the estimated Improvements cost. The <br />estimated Improvements cost is $165,915.00 per the City Engineer's estimate <br />attached hereto as Exhibit A; therefore, the LOC amount shall be $248,873.00. <br />As substantial elements of the Improvements are completed and approved by the <br />City Engineer, the City will authorize reduction of the LOC in an amount equal to <br />150% of the cost estimate for that phase of the Improvements deemed completed, <br />but in not case shall the LOC be reducedlto a point less than 10% of the original <br />amount until all Improvements are complete and accepted by the City. The LOC <br />t <br />Page 3 of 7 <br />r t Initials of Developer. <br />Initials of City Clerk <br />