My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA18-38 ExC Developer Agreement Signed by Jundts
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1400 Bracketts Point Road - 11-117-23-32-0025
>
Land Use
>
LA18-000038, Final Plat
>
CC packet 6-11-18
>
LA18-38 ExC Developer Agreement Signed by Jundts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 12:26:36 PM
Creation date
3/19/2026 12:26:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
swales, and ditches for public drainage have been constructed on public easements or land owned <br />by the City. Notwithstanding the foregoing, the City may issue building permits to the Developer, <br />prior to completion of all grading, provided the City Engineer has determined that adequate <br />erosion control measures are in place. The "as constructed" plan shall include field verified <br />elevations of the following: a) cross sections of ponds; b) location and elevations along all <br />swales, wetlands, wetland mitigation areas if any, and ditches, locations and dimensions of <br />borrow areas/stockpiles, and installed "conservation area" posts; and c) lot corner elevations, and <br />house pads. The City will withhold issuance of building permits until the approved certified <br />grading plan is on file with the City and all erosion control measures are in place as determined by <br />the City Engineer. The Developer certifies to the City that all lots with house footings placed on <br />fill will have been monitored and constructed to meet or exceed FHA/HUD 79G specifications. <br />16. CLEAN UP. The Developer shall clean dirt and debris from streets that has <br />resulted from construction workby the Developer, builders, subcontractors, their agents or <br />assigns. Prior to any construction on the Land, the Developer shall comply with all <br />recommendations of the City staff and City Engineer regarding site cleanup and restoration, <br />including but not limited to contaminated soil removal, junk and debris removal, etc. Also, prior <br />to any construction on the Land, the Developer shall identify in writing a responsible party and <br />schedule for erosion control, street cleaning, and street sweeping. <br />17. OWNERSffiP OF IMPROVEMENTS. Upon completion of the work and <br />construction required by this Contract and final acceptance by the City, the improvements lying <br />within public easements shall become City property without further notice or action. <br />18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION <br />OBSERVATION. The Developer shall pay a fee for engineering administration. City <br />Southways V3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.