My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4093
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4000 - 4099 (November 10, 1997 - June 22, 1998)
>
Resolution 4093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 11:42:56 AM
Creation date
11/18/2015 11:42:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�1 . . �. <br /> � O� <br /> • O O <br /> ��b. - CITY of ORONO <br /> � � <br /> �� G'� � RESOLUTION OF THE CITY COUNCIL <br /> . . � �`�kESxo4� � � _ . � rva 4 0 9 � � . . � � . � <br /> 15. It is the expectation of the City and the developer that the Metropolitan Council � <br /> will approve incorporation of the property within the Metropolitan Urban Service <br /> Area (MLTSA) and allow the extension of sanitary sewer to serve the plat. In this <br /> event, the developer shall construct said sewer to City standards, the design and <br /> construction of said sewer sha11 be covered under the Developers Agreement, and the <br /> Developer shall upon satisfactory completion of construction and acceptance by the <br /> City,transfer ownership of said sewer facilities to the City,and shall grant to the City <br /> appropriate easements over said facilities; and City shall henceforth maintain said <br /> sewer lines. <br /> 16. All identified primary and alternate sewage system drainfield sites within the <br /> subdivision shall be fenced off prior to any land alterations, and such fencing shall <br /> remain in place until such time that each Lot is developed, or until such time that the <br /> . . development has been provided with municipal sanitary sewer, whichever comes <br /> � .. � .� first. � . . <br /> 17. In the event that municipal sewer is not provided to the development, subdivider <br /> shall submit complete and acceptable septic system designs for each lot'prior to <br /> the issuance of individual residence structure building permits. <br /> 18. Subdivider shall be responsible for installing a new conforming septic system to <br /> serve existing residence on Lot 1 within 1 year of the date of final plat approval if <br /> ' municipal sewer is not available, or sha11 abandon the existing nonconforming septic <br /> system and connect to municipal sewer if sewer is available. <br /> 19. Applicant shall grant a sewer connection easement over Lot 5 for the benefit of Lot � <br /> � � . 4, subject to approval of the City Engineer. � - ' � <br /> 20. Prior to City release of the plat for filing, applicant shall provide evidence of fee <br /> ownership of the property in a form acceptable to the City Attorney, and applicant <br /> shall meet any other title requirements as may be required by the City Attorney. <br /> 21. Applicant shall provide all documents noted in this resolution in a format <br /> acceptable to the City Attorney prior to release of the plat for filing. <br /> , Page 5 of 6 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.