My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980 6th Avenue North - Septic Compliance - 2025 NONCOMPLIANT
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
1980 6th Avenue North - 27-118-23-42-0004
>
Septic
>
1980 6th Avenue North - Septic Compliance - 2025 NONCOMPLIANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2026 2:41:12 AM
Creation date
3/11/2026 10:37:30 AM
Metadata
Fields
Template:
Address
Street Name
6th Avenue North
House Number
1980
Address
1980 6th Avenue North
PIN
27-118-23-42-0004
Address Doc Type
Septic Compliance
Section
Septic
Description
2025 NONCOMPLIANT
Retention Effective Date
8/7/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />S'P TESTING, INC. Steven B. Schirmers - MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 - (612) 497-3566 <br />FAX (612)-497-5011 <br />State License #394 <br />April 15, 1999 <br />Dan Bergeron <br />1980 6th Avenue <br />Orono, Henn. Co., MN <br />This site has an existing on -site sewage treatment system which is classified as failed <br />due to not meeting the required 3' separation from the bottom of the system and the <br />saturated soil. <br />This on -site sewage treatment system is designed for a Type 1, three bedroom home, in <br />accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br />ordinances. <br />The soils on this site are SCS soils mapped - LrC - Lester loam. The seasonally <br />saturated soils were located at 36" to 46" (mottled soil). Due to the seasonally saturated <br />soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br />bottom of the treatment area must be located at least 3' above the saturated soils. <br />The soils at a depth of 12" have a percolation rate averaging 14.6 mpi. <br />The existing tanks may be used if water tight and upon approval from the local <br />Inspector. <br />A pumping chamber will need to be installed to lift the effluent to the treatment area. <br />The power supply and switches must be located outside the manhole and pumping <br />and sound device, this is in case of a pump failure, chamber in a weather proof enclosure. A warning device must be installed with alight <br />
The URL can be used to link to this page
Your browser does not support the video tag.