My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1595 Bohns Point Road - 08-117-23-44-0024
>
Land Use
>
78-424, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 12:43:19 PM
Creation date
3/10/2026 12:40:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br />VII. Receipt is her«hy acknowledge of S DOES NOT APPLY as peyrnent for cubic yards of sand, gravel <br />or rock and cubic yards of niuLk and sJT, the estintaterl arnount of material to be rernove<f hweuo..:.., <br />computed et the rate of ten cents per cubic yard for sand and gravel and two cents per cubic yard for muck and silt. <br />Permittee agrees by acceptance of this permit as shown t , commencement of work aulhoti"d hereunder to pay, by certified check, bank or <br />postal money order, made payable to the State Treasurer and delivered to the Director, Division of Waters, Soils and Minerals, Department of <br />Natural Resources, Centennial Office Building, St. Paul, Minnesota 55101. for any material removed from the bed of public wavers in excess of <br />that so e-tinated, at the above rate within thrity days after completion of the work authori),ed hereunder. <br />VIII. All dredge spoils shall be placed above the 100 year flood elevation of the <br />lake, and contained so that no direct runoff returns to the lake. <br />IX. If hydraulic dredging is used, all return waters must meet Minnesota Pollution <br />Control Agency regulations and the contairiment area s1iall be approved by DNR <br />prior to commencing construction. If other dredging methods are used, z-n off <br />site spoil disposal area shall be utilized. <br />X. All side slopes within the boat harbor shall be 3 horizontal to 1 vertical. <br />XI. Riprap shore protection shall be placed along the harbor bank after dredging to <br />stabilize the bank. <br />SEF. ATTACHED SPECIAL PROVISIONS <br />cc: City of Wayzata <br />Bea Ransfer, C.O. <br />St. Paul Waters <br />Hennepin Ccunty SWCD <br />LMCD <br />Minnehaha Creek WSD <br />ma <br />DATED AT ST PAUL, MINNESOTA. THIS ZZ- DAY OF <br />__.____-�7Litv�sK�r, ►�trri, -�r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.