My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1595 Bohns Point Road - 08-117-23-44-0024
>
Land Use
>
78-424, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 12:43:19 PM
Creation date
3/10/2026 12:40:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When work is performed by contr.icrt, the permittee Shall, prior to co;:mencement of <br />work, notify the Regional Hydrologist, in writir'_,7, the name of the contractor, <br />the address, phone nixnber and project foremen for project. <br />Permittee shall prepare or require the contractor to prepare a comprehensive <br />ero.-don and sediment control plan addressing constri_icti_on and final grade stabili- <br />zatioh to prevent erosion and sedimentation into public waters. Such plan shall <br />include, but not be limited to, bale diking, temporary ponding, temporary and/or <br />permanent sodding, seeding, mulching and netting. Such plan shall be completed <br />prior to commencement of authorized work and submitted to the Regional Hydrologist <br />for inclusion in permit file. <br />XVII. Permittee shall ensure that the contractor has received and thoroughly understands <br />all conditions of this permit. <br />XVIII. Perm:itte� and contractor are hereby advised that any violation of the conditions <br />of this permit cinstitute a misdemeanor, punishable by a fine of $500 and/or 90 <br />days in jail. <br />XI(. _ All exposed soil resulting from the authorized activity shall, within 48 hours of <br />completion of such work, be seeded with a mixture of perennial and annual grasses <br />and tne,i mulched with straw or, similar mulch. The use of sod as erosion protection <br />will preclude the need for seeding and mulching, provided the sod is installed with- <br />in the alotted time period and is staked on slopes steeper than 4 feet:'tior-izontal <br />distance every 1 foot of vertical rise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.