Laserfiche WebLink
PPF- <br />1•.O.RX IN THE BEDS OF PHOTEC:TGD WATEUS PI•:-V11T :.'0. 83-6150 <br />DATE July 15, 1983 <br />SPECIAL Pi:OVISIO-J!3 <br />(only the numbered Special Provisions apply to this permit) <br />XII. The permittee shall comply with all rules, regulations, requ;.rei".ents, or standards <br />of the Minnesota Pollution Control Agency and other applicably federal, state, or <br />local agencies. This permit does not obviate any rcquirc•ment for federal assent <br />from the U.S. Army Corps of Engineers, 1135 U.S. Post Office 6 Custo.z Howie, St. <br />Paul, Minnesota 55101. <br />After completion of the project authorized, pernittee shall notify the Regional <br />Waters' office se that a final inspection can be conducted and the permittee shall <br />supply the Regional Waters' office with photographs of the proje,-t area. <br />Spoil material shall not be placed on the beds of protected water.!, and wherever <br />possible, such material should not be placed anywhere within areas %ubjeck to <br />flooding. In the event spoil must be placed within flood plain areas because <br />areas free from flooding are not readily available, the spoil should be placed <br />parallel to the direction of flood flow and/or spread over a large .rea so as to <br />minimi any possible obstruction to the passage of flood waters.. <br />Future maintenance excavation of this project shall not exceed the dimensions <br />herein authorized. P~:or to commencing any maintenance excavation, permittee <br />shall advise the Department of Natural Resources in writing of the volume of <br />material to be removed, the manner of removal, and thr- spoil disposal site(s) <br />proposed. If the Department determines that a field inspection is necessary <br />prior to approving such maintenance work, the pvrinittee shall submit a check <br />payable to the State Treasurer to cover the actual coat of the 'lspection, or <br />$25.00, whichever iu greater, pursuant to Minne:.;ota Regulations 6 MCAR $ 1.5000, <br />Paragraph G. Maintenance excavation shall not be commenced until pe-mitt:�e's <br />receipt of the Department's approval. This approval will incluci:--, a permit card <br />to be posted at ti.? site. <br />XIV• Permittee r,hall ensure that the contractor has received and thoroughly understands <br />all conditions of this permit. <br />Xv. Permittee and contractor are hereby advised that any violation of the conditions <br />of this permit constitute a misdemeanor, punirhabl.� by a fine of $500.00 and/or <br />90 days in jail. <br />Adequate erosion control (straw bale dikes, filter fence:., sediment ponds) shall <br />be installed prior to commencement of authorized work and shall he maintained <br />throighout project until site has been restored and stabilized as indicated in <br />*he following Special Provision. <br />Xyi. _ Ali exposed nuil resulting from the authorizer) activity uhall, within 72 hours <br />of completion of such work, be seeded with a mixture of perennial and annual <br />grasses and then mulched with straw or similar mulch. The use of sod as erosion <br />protection will preclude the need for-;eedinq and mulching provided the God is <br />installed within the iluttrrd time Eger iud and i,.. staked on slopes site >er than <br />four feet horizontal distance per every one foot of vrrtical rise <br />XVII. Permittee shall notify the per:;.mnc-1 (J96-7523) 48 hour: prior <br />to intent to commencer authc)r izcd wvO.. <br />