My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1700 Bohns Point Road - 16-117-23-22-0003
>
Land Use
>
93-1838, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 11:40:51 AM
Creation date
3/5/2026 11:39:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert Owens <br />GME Project No. 3766 3 October 19, 1992 <br />Prior to construction, we recommend that a topographical survey be made <br />of the lot by a Registered Land Surveyor. This topographical survey <br />would be integral to the successful design and construction of the <br />slope repair. In addition, we also recommend that test borings be <br />performed to evaluate the engineering properties of the soils for <br />purposes of conducting a slope stability analysis. The borings should <br />be taken within the existing slope and near the crest of the slope. <br />Due to difficult site access, the borings would probably have to be <br />performed using hand augering techniques. <br />We trust this provides you with the preliminary information needed at <br />this time. We would be pleased to assist you once plans have <br />progressed further by performing the field exploration and reviewing <br />the final design concepts. If you have any questions, please contact <br />us. <br />Sincerely, <br />GME AoNsu½J3/1';JJ INC. <br />~l.,~ 1( I (J - <br />Gregory R. Reuter, P.E. <br />S~roje~ <br />Mervyn Mtess, P.E. <br />Principal Geotechnical Engineer <br />Enclosure <br />GRR:MM:smc
The URL can be used to link to this page
Your browser does not support the video tag.