Laserfiche WebLink
- f D �6 <br />Bonestroo, Rosen*, Anderlik A Associates, Inc. <br /><Mw L A..Wwrww. P t <br />(.Ara a re". I L <br />o <br />Awwr. r ( <br />fe+.r+ t Aairy, r L <br />Araw A l ereA.n. <br />ra,... � M.,.,. r L <br />Aravwo A 1ww61 P A <br />A. aerd w I wow. P L <br />2335 W. Trunk Highway 30 <br />Engineers • Architects <br />A.rAerd 6 rwarr. P! <br />f-we C cxj�. P r <br />Aedwo G i.'Arwwfa. P L <br />A*www L sormair. P t <br />St. Paul, AM 55113 <br />°ia'" C '"rg"''' P E <br />•12_"&4M <br />Ae.. A Mrawnw P L <br />rNa FWK P! <br />ill• Aanr, r aerrowee P f <br />June 1 1 1986 <br />Aedwr A ►i.n.•+. P ( <br />. <br />Dowd G Larders, P L <br />roar it drown.. P t' <br />Mrr*rf C LO A. P <br />City of Orono <br />�a Waft,r <br />Pr <br />Ahwo <br />Box 66 <br />,.,wane. P Aadorw.& P f <br />Crystal Bay. Mli 55323 <br />Ara* A ArAwww. P L <br />A...a Awr.PA <br />No"" C Iart. A f A <br />Attn: Jeanne Maybusth <br />rb~ a Ayr. P L <br />Stan re.y. PL <br />LMIYn A lntra <br />Re: 139 - 1040 Ulrich <br />Low Al /►eArl <br />.00000110 else <br />Saw M Morro <br />Dear Jeanne: <br />We have reviewed the plans submitted on the Ulrich property for the seawall, <br />foundation drains and heat pump discharge. <br />The seawall plan should include the detail infor•aation submitted when the <br />axisting wall was built. The certification by 11he engineer should not contain <br />the tors "appears to be adequate". The Owner's engineer should check out the <br />design and certify that what is proposed -seats standard design criteria. <br />The foundation drain plan should be modified to stop the drain field 10 feet <br />short of the lake shore. The drain the should then be connected into a dis- <br />tributor box and an overflow line provided. <br />The heat pump discharge line plan should provide the following additional <br />information: <br />1. Average discharge <br />2. peak discharge <br />). Velocity of water exiting holes in last pipe length <br />6. Method of anchoring to lake bed <br />5. Improved profile taforustion with station of paint elevations indica- <br />te1 include station at lake shore <br />6. Well data-94pth. gigs. capacity <br />1. 0ioe►sa•se temperature of water s"mar and wintwr <br />The dept* of the discharge line is shown approximately 5 feet below the normal <br />water elevation. Is tflis adequate clearance for boats which operate w,this <br />100 feet of the lake shore? The owner will also need a D*b permit for instal- <br />lation of the discharge line in the lake bed. <br />Page I <br />5 ; OAd <br />30 Year <br />Anniversary <br />