My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - 08-117-23-44-0025
>
Land Use
>
86-1039, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 9:54:22 AM
Creation date
3/5/2026 9:49:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINU'a THE PLANNING COMiIISSION MEETING hELD AUGUST S, 1986 <br />WDANCE 7:30 P.M. <br />The Orono Planr,in.-Insion imet on tie- above date with <br />the following mem►: �csent: chairman Re':' ey, Bellows, <br />Rovegno, Goetten, M.:T:unald, and Hanscn_ Taylor was <br />Absent. The follcw.Lng represented the City staff: <br />Building & Zoning Administrator Mabusth, -istant <br />Zoning Administrato, Gaffron, and City Recorder <br />P.-terson. Also presi�n,!� mere Counci'member Frahm and <br />Consulting Engine, : ►4ik6 ' ynch. <br />�1039 J DLRIcB <br />1375 W)HN' S POINT ROAD <br />CONDIytONAL USE iKWIT/vAAIANCE <br />SECOND Rwl= 9:11- - 10209 <br />Applicant's Attorney Tom Humphrey introduced the <br />following people present for this matter: <br />John Noble, Project Di-ector; Mark Gronberg, <br />Surveyor; C-�ff Reep, Indepe-.idant Shoreline <br />Consultant; George Shoppie, Master Plumber & <br />Engineer: Dean Buendorf, Vice Presiden i_ Terra - <br />Therm Inc. :he manufacturer and distribu" •r of the <br />proposed geothermal hey: ping/cooling systec, <br />Based on r,)-kerns raised <br />at the last Planning <br />Commission melting, Mr. Humphrey noted that the following <br />conclusions can be made from the <br />supportive data: <br />1. The wel will not have <br />a significant impact on <br />other wells in the area nor <br />on th ater table. <br />2. There will not be ar• <br />dP affect on Lake <br />Min tr- a as a resul' <br />he velocity or <br />tempera -� of water di <br />3. Because the dischar <br />is in the bottom A <br />the lagoon, there will <br />rnavig.itional hazard to <br />traffic on Lake Minnetcnk <br />4. Because it is a close] <br />sys- ',-e-e will be no <br />pollution hazard. <br />Mr. Humphrey noted that tt ystew which the applica:.r <br />has choacn tc use is a permitte. system. Addressing the <br />hardst.. r) involved with the locatic,r of discharge pipP in <br />the lagoon vs. the wetland area, he stated that i - <br />pipe w,,ure discharged in the wetland area, there woua. <br />a chance of the pipe freezing making the sys <br />in. • k r at,ie . <br />r. Humphr, iewed the other egenc a approval <br />ollows: <br />DNR - They have issued the well permit that has <br />perni.tted the installation of the well and also the <br />use if the water for heating and cooling. <br />Dept of Fisherier - They find no harmful effects <br />from L he wat *- discharged i n .c the lagoon <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.