My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - 08-117-23-44-0025
>
Land Use
>
86-1039, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 9:54:22 AM
Creation date
3/5/2026 9:49:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1039 <br />August 14, 1986 <br />Page 2 <br />Staff's only concern with Boudreau's finding is that permit 86- <br />6178 was issued by the DNR on April 22, 1986 (Exhibit C). Staff <br />specifically asked in the Local Unit of Government response (Exhibit <br />Q) that the DNR delay all action until the City's review is completed <br />dated June 11, 1986 - form recieved by City 5/19/86. The City never <br />received the same material for permit review 86-6178 and yet note in <br />that letter of approval that the mayor of the City may call for a <br />public hearing within 30 days. <br />Staff has reviewed this matter with John Noble who had correctly <br />assumed that the DNR would have taken care of this through normal <br />procedural review. He advises that the well had to be drilled before <br />the DNR would consider the permit (this has been confirmed by staff) <br />and that the well serves not only the geothermal use but will serve <br />the more intense needs cf the residence. <br />Staff has had difficulty tracking down John Fax because he has <br />been transfered to a different division. Clearly, this is not a <br />problem related to the applicant's doing but a failure of <br />communication between the two levels of government. Staff will <br />resolve thin matter with the DNR. The issue has been reviewed in this <br />memo because certain members have addrer--ed the installation of the <br />well and the unvsual timing of the installation. <br />Issues for convideration: <br />1. Could the discharge pipe have been deEigned to drain into wetlands <br />to the east - without creating drainage problems for surrounding <br />properties? <br />2. Is Planning Commission satisfied that City's only Jurisdiction <br />over this specific application ib the excavation and installation of <br />underground lines within the lakeshore protected area. It would <br />appear that both P.C.A. and the DNR are satisfied with the use level <br />and well specifications For ground water use. <br />3. Are there other areas in this review that should be considered as <br />part of the City's review? <br />Staff has asked that an engineer from Bonestroo, Anderlick i <br />Associates be present to respo.id to any questions you may have <br />regarding the relevance of the technical information submitted in <br />response to our specific questions. Please contact my office prior to <br />the meeting if any member has additional questions. <br />It Planning Commission is ablt to make a recommendation upon <br />satisfaction that all applicable standards have been addressed, refer <br />to Section 10.09, 10.00 and 10.55, Subdivisior 25 A for direction in <br />m %.ing the necessary findings fc: action - note you would be dealing <br />with both a c-r, iit Iona l use permit and variance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.