My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4146
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 4100 - 4199 (June 22, 1998 - November 23, 1998)
>
Resolution 4146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 2:07:03 PM
Creation date
11/17/2015 2:07:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• , <br /> , <br /> � O ' V <br /> • O O . <br /> ��b. � CITY of ORONO <br /> � ' ti <br /> �� �'� RESOLUTION OF THE CITY COUNCIL <br /> . � ��kESH�4�' . . : � NO. � Y � �9 . . <br /> b. No parts of the tee and bunker plan involve excavation within designated City <br /> wetlands or in wetlands designated by the National Wetland Inventory. <br /> c. Each of the many individual grading projects(which as a group comprise the <br /> tee and bunker plan) appear from the submitted grading plans to have no <br /> � impact on neighboring properties, and none will result in changes in the <br /> characteristics of the watershed. A majority of individual projects will <br /> � involve fill in amounts less than 500 cubic yards. . <br /> d. The proposed expansion of ponds on holes#5, 6&12 will require additional <br /> detailed review as well as potentially require permits from other agencies with <br /> jurisdiction over wetlands. The ponds on#6 and#12 are NWI wetlands and <br /> � that on#6 is also a City-protected wetland. <br /> � e. The proposed tee and bunker construction/reconstruction program is intended <br /> . � by the applicant to take place over a period of years, and it would be � <br /> appropriate that the City approve the entire master plan for such conshuction/ <br /> reconstruction and allow City staff to issue a separate land alteration permit <br /> each year to the applicant for project elements proposed for that year,without <br /> requiring additional Planning Commission or Council review. <br /> 4. The City Council has considered this application including the findings and <br /> recommendations of the Planning Commission,reports by staff and comments of the <br /> applicant and the effect of the proposed use on the health, safety and welfare of the <br /> community.� <br /> 5. The City Council fmds that granting a conditional use permit for the construction <br /> . and/or reconstruction of tees and bunkers as proposed will not be detrimental to the. <br /> � health, safety or general welfare of the public,would not adversely affect light, air � <br /> nor pose a fire hazard or other danger to neighboring property, nor will it depreciate <br /> surrounding property values and that the proposed level of use of the property will <br /> be in keeping with the intent and objectives of the Zoning Code and Comprehensive <br /> Plan of the City. <br /> • Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.