My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1635 Bohns Point Road - 17-117-23-11-0006
>
Land Use
>
10-3481, VAR renewal
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 2:05:54 PM
Creation date
2/26/2026 2:04:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ST □Fli~@ Stork Twin City Testing Corporation <br />Materials Technology <br />Proposed New Residence at 1635 Bohns Point Road <br />Orono, Minnesota <br />Stork Twin City Testing Corporation Project #TCT006405P <br />5.0 CONSTRUCTION CONSIDERATIONS <br />5.1 Excavation Safety <br />Page 10 of 11 <br />All excavations should comply with applicable O.S.H.A. standards. Excavation safety is · <br />the responsibility of the contractor. <br />5.2 Cold Weather Construction <br />Construction during cold weather should be exercised with care. We have included a <br />sheet entitled "Precautions for Excavating and Refilling During Cold Weather". <br />5.3 Field Observations and Testing <br />As variations in soil conditions may exist at locations and elevations other than those of <br />our boring, we recommend the geotechnical engineer be retained to observe the soil <br />conditions during site preparation. We also recommend observation during site <br />earthwork procedures. We recommend in-place field compaction tests be performed on <br />the compacted fill placed to design grades. <br />5.4 Soil Sensitivity <br />The clayey soils encountered within the soil boring are susceptible to disturbance from <br />construction traffic, especially in wet conditions. If the soils become disturbed, <br />additional excavation may be required. Therefore, proper excavation equipment should <br />be used to minimize the potential for disturbance. <br />lnformatton and statements L11 this repOlt are dertved from material, 1nronnation and/or specifications furnished by the cllent and excluda any e:xpressed or implied warranlies as lo the mness of the material tc:sled <br />or analyzed for any particular purpose or us-e, This certificate or report ls the confidential property of our client and may not be used for advertisfng purposes. Tl1ls certificate or report shall not be reproduced <br />ex<;ept in fufl, wilhout written .approval of this laboratory and shell be signed or oll'U~IWJse approved by authorized' staff membess only. The recoming of false, fictitious or fraudulent statements or entries on lhis <br />document may be punished as a felony under Federal Stalues including Federal Law T!Ue 1 a, Chapter 47, TbJs document contains technical data whose export and re-exportlre•transfer is subject to control by <br />tt,e U.S. Department or Commerce under the Bcport Administration Act and tho Export Administration Regufations. T11e department of Commerce's p!iorwritlen approval is required for the export or re~export/re• <br />transfer of such technical information lo any foreign person, foreign enthy or foreign organization whether in the United States or abroad. EAR-CONTROLLED DATA.
The URL can be used to link to this page
Your browser does not support the video tag.