My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1635 Bohns Point Road - 17-117-23-11-0006
>
Land Use
>
10-3481, VAR renewal
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 2:05:54 PM
Creation date
2/26/2026 2:04:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ST□Rl~,f" Stork Twin City Testing Corporation <br />Materlals Technology <br />Proposed New Residence at 1635 Bohns Point Road <br />Orono, Minnesota <br />Stork Twin City Testing Corporation Project #TCT006405P <br />Page 2 of 11 <br />4. Prepare a geotechnical report which includes the following information: <br />a. Logs of the soil test borings showing the soil and groundwater data. <br />b. A site plan showing the approximate boring locations. <br />c. Written description of encountered soil and groundwater conditions. <br />d. Recommendations for site preparation, allowable bearing capacity and <br />other geotechnical considerations. <br />The scope of our work is intended for geotechnical purposes only. This scope.is not <br />intended to explore for the presence or extent of environmental contamination at the <br />site. <br />2.0 FIELD TESTING PROGRAM <br />2.1 Soil Borings <br />A total of one (1) soil test boring was drilled on the site on April 18, 2011. The <br />approximate boring location is shown on the attached site plan. The planned location of <br />the test boring was determined by Erotas Building Corporation to provide a general <br />overview of the subsurface conditions. Our drill crew elevated the boring using a <br />temporary benchmark established using the existing residence garage slab. This <br />elevation was assumed to be 100. O'. <br />The standard penetration boring was performed with an All-Terrain-Vehicle (ATV) <br />mounted rotary drill rig using split-barrel sampling procedures. Water level observations <br />were made in the borehole prior to advancing the borehole with drilling mud. During the <br />field operations, the drill crew maintained a log of the subsurface conditions including <br />changes in stratigraphy and the observed groundwater levels. The boring log is <br />attached. <br />lnfonnaHon and statements In this report ate derived frorn rnatertal, lnformatlon aridfor specmcaUons rumished by the clle-nt and exclude any expressed or implied warranties as Lo the fitness of lhe material tested <br />or analyzed for any particular purpose or use. This certi(rcate or report is the confidential proper1y of our client and may not be used for advertising purposes. This certificate or report shall not be reproduced <br />except in full, without written approval of this laboratory and shall be signed or otherwise approved by authorized staff members only. The recording of f&lse. fictitious or fraudulent statements or entries on this <br />document may be punished as a felony under Federal Stalues inclt1dfng Federal Law Title 16, Chapter 47. This document contains technical da.ta whose export and re-export/re-transfer is subject to conlrol by <br />lhe U.S. Department cf Commerce under the Export Administration Act and the Export Administration Regu!.Eltions. The department of Commerce's prior written approval is required for the export or re-export/re• <br />lransfer or such technical information 10 any foreign person, foreign entity or foreign organization whether in the United states ar abroad. EAR-CONTROLLED DATA.
The URL can be used to link to this page
Your browser does not support the video tag.