My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1635 Bohns Point Road - 17-117-23-11-0006
>
Land Use
>
09-3417, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 2:01:14 PM
Creation date
2/26/2026 1:59:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Moseley Residence <br />Ulteig Project No. 09.01410 <br />June 16, 2009 <br />Page3 <br />some point loads at various locations of the existing foundation walls. Once finalized <br />architectural and final truss drawings are completed, these point loads should be evaluated <br />and may require the existing walls to be solidly grouted in these areas. <br />PROFESSIONAL OPINION <br />3. It is our professional engineering opmron that the existing foundation is structurally <br />adequate to support the proposed addition noted above and will meet the requirements of <br />the Code. <br />GENERAL <br />4. The information, observations, and op1rnons stated in this report are based on the <br />preliminary architectural drawings and the site visit noted above. The general contractor <br />shall inspection the existing materials, observing all structural elements during construction <br />to ensure the exposed and hidden materials are in adequate condition. If any structural <br />element is found to be deteriorated or damaged, contact Ulteig immediately. <br />5. The observations and opinions expressed in this report were based on our professional <br />engineering judgment and professional practice. <br />6. All work shall be done in accordance with this document, standard industry practices, and <br />the requirements of the Code. <br />7. No other engineering was performed or requested for this project. It is recommended that <br />Ulteig be consulted to assist in the point load analysis once final drawings have been <br />completed. <br />If you have any questions, please contact me. <br />Sincerely, <br />Ulteig Engineers <br />Nick Hanson1 PE <br />I hereby certify that this plan, specification or <br />report was prepared by me or under my direct <br />supervision and that I am a duly licensed <br />professional engineer under the laws of the State of Mh,nes7!/Jµ; <br />Nick Hanson <br />Date: ___ """6 .... -1 .... 6...,-0'"'"9 ...... ____ _ <br />Minnesota Registration No. 44774 <br />RECEIVED <br />JUN l 7 2009 <br />CITY OF ORONO
The URL can be used to link to this page
Your browser does not support the video tag.