My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1625 Bohns Point Road - 17-117-23-11-0003
>
Land Use
>
04-3042, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 1:28:56 PM
Creation date
2/26/2026 1:12:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j fl j Bonestroo· <br />9 Rosene <br />"1\11 Anderlik & <br />1 \11 Associates <br />Engineers & Architects <br />October 12, 2004 <br />Ms. Janice Gundlach <br />Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />2? X/est Highway 36 • St. Paul, MN 55113 <br />Office: 651-636-4600 • Fax: 651-636-1311 <br />www.bonestroo.com <br />Re: 1625 Bohns Point Road <br />File No. 139-04-000 <br />Plat No. 04-3042 <br />EXHIBITF <br />--~ ... ,, ., <br />" ~ .I- <br />ocr 1 3 2004 <br />t.11 'lv,v . 11 UN0 <br />We have reviewed the proposed and as-built grading plans for the home constructed at 1625 Bohns Point Road. The <br />applicants engineer calculated the amount of fill brought into the site at 3940 cubic yards. The previously approved <br />grading plan estimated that 1650 cubic yards of fill would be brought onto the site to construct the home. The additional <br />fill has raised the grades in several areas and has impacted the drainage across the property. We have the following <br />comments with regards to engineering matters: <br />• The as-built grading plan does not agree with the building permit grading plan in several areas, particularly <br />along the north lot line. The area between the pool and the north lot line was defined as a high point with swales <br />routing water easterly and westerly on the building permit grading plan. These swales were meant to keep <br />drainage on the subject property and convey flows either westerly to the lake or easterly to the existing pond. <br />The as -built grading plan does not show that these swales were constructed as planned and it appears some <br />water is directed northerly from the high point onto the adjacent property. In addition, water traveling easterly to <br />the pond crosses over the north lot line onto the adjacent property approximately 35 to 40 feet west of the point <br />shown on the building permit grading plan. The defined swale shown on the building permit grading plan <br />westerly from the high point was not constructed. We recommend that the applicant regrade along the north lot <br />line to contain water on the subject property to the extent shown on the building permit grading plan. <br />• The proposed swale along the south side of the home shown at the 932 contour on the building permit grading <br />plan was not constructed. This area should be regraded to direct water towards the lake and to drain the low area <br />between the subject property and the property to the south. <br />• The City should review and inspect any grading revisions and verify that the changes agree with the previously <br />approved building permit grading plan. <br />• Silt fence and any other necessary erosion control measures should be installed, inspected and approved by city <br />staff prior to any work on site . <br />If you have any questions please call me at (651) 604-4863 . <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC . <br />;;;;,.,y+ <br />Tom Kellogg <br />Cc: Greg Gappa, c:;ity of Orono <br />Bruce Vang, City of Orono <br />• St. Paul, St. Cloud, Rochester, Willmar, MN• Milwaul<ee, WI• Chicago, IL <br />Affirmative Action/Equa l Opportunity Employer and Employee Owned
The URL can be used to link to this page
Your browser does not support the video tag.