Laserfiche WebLink
CITY OF ORONO Page 7 of 11 <br />1987 BID TABULATIONS FOR STREET MATERIALS 6 EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS --EQUIPMENT IS BID PER HOURLY RATE <br />12"CMP <br />1511CMP <br />1811CMP <br />24"CMP <br />24"CMP <br />36"CMP <br />48"CMP <br />60"CMP <br />16 GAUGE <br />16 GAUGE <br />16 GAUGE <br />14 GAUGE <br />16 GAUGE <br />14 GAUGE <br />12 GAUGE <br />10 GAUGE <br />---------------------------------------------------------------------------------------------------- <br />ALL iRICES ZO BB DELIVERED <br />All Steel Products 5.00 <br />5.60 <br />6.30 <br />10.50 <br />8.30 <br />15.00 <br />29.00 <br />45.00 <br />(1) <br />------------------------------------- <br />Contech Inc. 4.96 <br />---------------------------------------------------------------- <br />6.11 <br />7.28 <br />11.58 <br />9.64 <br />17.28 <br />30.21 <br />47.00 <br />* <br />(1) <br />(2) <br />(2) <br />(2) <br />(1) <br />(2) <br />(1) <br />----------------------------------------------------------------------------------------------------- <br />H.V. Johnston 5.30 <br />6.23 <br />7.22 <br />11.41 <br />9.35 <br />17.57 <br />29.75 <br />50.59 <br />(2) <br />(2) <br />(1) <br />(1) <br />(1) <br />(2) <br />(1.) <br />(2) <br />* DENOTES LOW BID <br />1-2 ALTERNATES <br />