My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-30-1987 Council Packet
Orono
>
City Council
>
1987
>
03-30-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 12:57:44 PM
Creation date
2/23/2026 12:54:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO PLANNING COMMISSION MRETING - PUBLIC HEARING <br />HIGHWAY 12 CORRIDOR STUDY/COMPREHENSIVE PLAN AMENDMENT <br />TUESDAY, FEBRUARY 3, 1987 7:30 P.M. <br />The Orono Planning Commission met on the above date with the <br />following members present: Chairman Kelley, Members Bellows and Taylor. <br />The following represented the staff: City Administrator Bernhardson, <br />Buildin+ 6 Zoning Administrator Mabusth, and Assistant Building 6 Zoning <br />Admini ator Gaffron. John Shardlow from Dahlgren, Shardlow 6 Uban was <br />press to represent the City. The following were also present: <br />Councilmember Sime and Peterson. Mayor Grabek was in attendance for the <br />later part of the meeting. <br />City Administrator Bernhardson explained that of the seven <br />positions on the Planning Commission there are 3 vacancies and of the <br />rer,.gining four, one member was called out of town and was unable to make it <br />back in time for the meeting. Because of thic, the hearing may be <br />conducted as scheduled and listen to public commei,.s, however, no formal <br />action will be able to be taken, therefore, formal action will be deferred <br />until the February 17, 1987 Planning Commission meeting. <br />City Administrator Bernhardson explained the Council, at their <br />November 26, 1986 meeting, directed staff to draft a comprehensive plan <br />amendment to incorporate the changes in the Highway 12 corridor as <br />indicated at tl..,t meeting. Once the Planning Commission has reviewed and <br />made recommendations, the comprehensive plan amendment will be taken to the <br />Council for preliminary approval and then to the Metropolitan Council for <br />their approval. The Council and Planning Commission will then work or <br />adopting the implementation tools to make the amendment a possibi � ! f.r. <br />once those tools are in place, the City would then be in a positicn +o <br />accept development plans, etc. for this area. <br />City Administrator Bernhardson noted the study area consists of <br />all the lands in Orono abutting Highway 12 from County Road 6 on the west <br />to Brown Road North, which then abuts the City of Long Lake, :nd three <br />parcels on the east which are surrounded Ly the cities of Long Lake and <br />Wayzata and interspersed by a piece of Wayzata. The study was undertaken <br />be^ause of numerous inquiries about rezoning from the existing 2-acre rural <br />residential. The study consisted of 9 meeti:gs starting in September 1985 <br />through November 1986. <br />City Administrator Bernhardson explained during the study <br />process, that following an inventory and ansylsis stage, the Council <br />identified four principal areas for goals and objectives of the study, as <br />follows: <br />1. Land tine - compatible land uses and transitions back from Highway <br />12, if there are to be changes. <br />2. Transportation - both through and across the Highway 12 corridor <br />for vehicular or non -vehicular traffic. <br />1. Environmental protection - includinq ].eke Minnetonka and Long Lake <br />and other natural features of the area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.