Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, January 18, 2010 <br />6:30 o'clock p.m. <br />(#10 -3438 DNA PROPERTIES, LLC, 1535 BOHNS POINT ROAD, CONTINUED) <br />was calculated at the 75-foot setback from the OHWL of the lake as the lots are uniform in shape. <br />In general , it appears that the lots are acceptable with building sites meeting City standards . The <br />developer has shown potential home locations , graded building pads for walk-out homes and swales down <br />the common lot lines within the drainage and utility easements . The purpose for proposing the building <br />pad locations is two -fold : to establish a new existing lakeshore setbacks should the properties not be <br />developed simultaneously. One home l ocation could create unforeseen impacts to the average lakeshore <br />setback line for the two other lots if developed separately. <br />Staff recommends that the new lots be subject to the standard 8 percent park dedication fee . Based on the <br />2010 land value, the fee would be $367 ,840. However , the park dedication ordinance cap s the actual fee <br />at $5 ,550 per dwelling unit , so the two additional units result in a park fee of $11 ,100. <br />The City requires standard perimeter and drainage easements around all property boundaries in the plat. <br />Storm water trunk fees apply to new development and redevelopment of existing properties and provide <br />funding for the storm water infrastructure necessary to serve the City. The trunk fee is based on the lane <br />use and acreage of he property being developed. The property will be subject to the 2010 stormwater <br />and drainage trunk fee of$4 ,330 per acre of$21 ,173 . <br />The properties would be served by city sewer and private wells . Municipal sewer lines are available in <br />Bohns Point Road with two existing connection stubs . A third stub will have to be installed. The <br />property was provided with sewer in 1965 and assessed based on front footage. Met Council SAC <br />charges will be collected at the time building permits are issued. <br />The proposed plat appears to meet the City 's ordinance standards for development in the LR-lB z one. <br />Staff recommends approval of the plat with a revision in the lot line between Lots 2 and 3 to include the <br />small piece of land north of the lagoon entrance with Lot 2 rather than Lot 3 as shown. <br />Staff recommends approval of the plat with a revision in the lot line between Lots 2 and 3 to include the <br />small piece of land north of the lagoon entrance with Lot 2 rather than Lot 3 as shown. <br />Schoenzeit asked whether there would be a covenant on the properties requiring the owners to build in <br />the proposed locations. <br />Curtis stated there is no covenant being proposed and that the purpose of the application is to achieve <br />a desired style of home with an approved grading plan. <br />Gronberg indicated they would like to get the application approved so that the individual lot s would have <br />an approved building envelope for the future purchasers of the lots . Gronberg stated they did move the <br />house pads further away from the lake to help reduce hardcover . <br />Schoenzeit asked whether a significant amount of fill is necessary to accommodate the walkouts. <br />Gronberg indicated approximately five feet of additional fill will be needed in the front and <br />approximately three feet in the back. Gronberg stated they did meet with the City Engineer and Staff to <br />discuss the drainage and that they are proposing drainage swales on the north and south sid es of the house <br />------------------Page4