My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - 08-117-23-44-0025
>
Land Use
>
14-3646, Prelim Plat
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2026 2:49:11 PM
Creation date
2/19/2026 2:47:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC Exhibit H <br />1535 Bohns Point Road <br />#14-3646 <br />Summary Estimate of Fees* <br />Preliminary Subdivision Plat Application: <br />Preliminary Subdivision Application $850 +$30/lot <br />Application Escrow (guarantees payment of City's consultant costs) $2,500 <br />Estimated cost of City Engineer's review of preliminary plat $2,500 <br />(Actual cost will be billed to property owner) <br />Collected with Application $910.00.00 + $2,500 escrow <br />Final Subdivision Plat Application: <br />Final Subdivision Application, including Legal Review and Filing <br />(w/ covenants) (Covers first review of documents, if additional time is <br />required, those costs will be billed to the property owner.) $700 <br />Storm Water and Drainage Trunk Fee $5,000/acre * <br />(paid for the entire plat) <br />Park Fee {8% of Fair Market Value), but no less than <br />$3,250/per lot and no more than $5,550 per lot x #of new lots $5,550/lot <br />Estimated cost of City Engineer's review of final plat <br />(Actual cost will be billed to property owner) <br />$500.00 <br />Final Subdivision Application Fee, Storm Water and Drainage Trunk Fee, Park Fee are to be paid with the Final <br />Plat application. Letter of Credit or other required securities are to be submitted with the Final Plat application. <br />Consultant costs can be on-going and are to be paid in full before the final plat is recorded. <br />*Based on 2014 Fee Schedule
The URL can be used to link to this page
Your browser does not support the video tag.