A-1115]1�[�I�Li _Llt�ill�l[yl:L�l[�LF
<br />Building Permits Based on Value Table
<br />Building permit fees (Building, Plumbing, Based on 2024
<br />Mechanical, unless otherwise noted) Building Valuation Table
<br />Plan Review Fee
<br />65% of Building Permit Fee
<br />Rereview Plan Fee
<br />Up to the cost of the Plan
<br />Review Fee Based on
<br />Building Offical
<br />Recommendation
<br />Minimum Fee
<br />$29.50
<br />Moved -In Structure (not including foundation,
<br />interior remodel, etc.)
<br />$275.00
<br />Pre -Move Inspection
<br />$165.00
<br />Special investigation fee (work started without
<br />100% of Building permit fee
<br />obtaining a permit —applies even if no permit is
<br />pulled)
<br />Manufactured Home Installation $275.00 plus
<br />State Surcharge and requires a regular building
<br />permit if also doing basement, foundation, garage
<br />$275.00
<br />or entryway, fees are based on sq. ft. State Table
<br />Refunds: 80% of building permit fees on projects not yet started (within 90
<br />days of permit issuance by municipality). No refund on plan review fees, state
<br />surcharge or maintenance permits
<br />City Administrator may require an erosion control escrow for projects
<br />disturbing soils.
<br />Valuation based on ICC 2024 Building Valuation
<br />tables
<br />$1,000.00
<br />Total Valuation
<br />Fee
<br />$1.00 to $500.00
<br />$29.50
<br />$501.00 to $2,000.00
<br />$28 for the first $500.00 plus $3.70 for each additional $100.00, or fraction thereof, to and including
<br />$2,000.00
<br />$2,001.00 to $25,000.00
<br />$83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00, or fraction thereof, to and
<br />including $25,000.00
<br />$25,001.00 to $50,000.00
<br />$464.15 for the first $25,000.00 plus $12 for each additional $1,000.00, or fraction thereof, to and
<br />including $50,000.00
<br />$50,001.00 to $100,000.00
<br />$764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction thereof, to and
<br />including $100,000.00
<br />$100,001.00 to $500,000.00
<br />$1,186.64 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction thereof, to
<br />and including $500,000.00
<br />$500,001.00 to $1,000,000.00
<br />$3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to
<br />and including $1,000,000.00
<br />$1,000,001.00 and up
<br />$6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof
<br />State Surcharge as required by State.
<br />Demolition
<br />Demolition: Principal structure
<br />Demolition: Accessory structure/Septic system
<br />(Per unit fee)
<br />City Engineer may require an erosion control
<br />escrow for projects disturbing soils.
<br />$100.00
<br />$50.00
<br />Not to Exceed
<br />$1,000.00
<br />37