Laserfiche WebLink
CITY OF ORONO <br />Municipal Offices <br />Post Office Box 66 <br />Crystal Bay, MN 55323-0066 <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />Owner:[�Ir�/(�) Address• _' r <br />Permit /•9:�1� _Dates: �eC—�_Contractors: <br />v <br />City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. <br />The on -site sewage treatment system at the above address has been inspected and appears to fall into the category <br />checked below. <br />(This is [Dd an existing system [ 1 new construction) <br />"CODE SYSTEM11-A system which meets all the location, design, and construction standards of the current City <br />Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br />without discharging any pollutants into ground or surface waters. <br />"CONFORMING SYSTEM11-A system which does not meet all the Location, design, and construction standards of the <br />current City Codes, but was installed according to the code in effect at the time of installation, and which <br />is operating satisf :torily by treating and disposing of the entire current sewage input without discharging <br />any pollutants into ground or surface waters. <br />"NON -CONFORMING SYSTEM" -A prohibited system; a system located within a designated 100-year floodplain; any <br />system which may or may no! meet all the location, design, and construction standards of the current City <br />Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand <br />between the distribution device and the limiting soil characteristics. <br />(The limiting soil characteristic has or [ I has not been identified at this time. If the limiting soil <br />characteristic has not been identi ied, this classification may be subject to revision.) <br />T� inspection indicates: <br />CSC Pumpout not needed at this time. <br />6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. <br />7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. <br />8 System is discharging to the surface. Tanks must be pupped out within 48 hours to eliminate surface discharge. <br />9 inspection risers missing -tanks could not be inspected. Inspection risers (41, dia. pipe) must be installed in each <br />tank at next ptmpout. If tanks have not been pumped out within the last three years, they should be pumped <br />Out now. <br />10 Inspection pipe is located directlyover tank baffle (does not give accurate measurement of solids accumulation). <br />If tanks have not been pumpedoutwithin the last three years, they should be pumped out now. <br />D r/►�}��ekd• tnspee -1 i nd i c a t es�`� � � , [ �� ' �(� L'S <br />(1y rainfie((d is dr 'no serfacir.g evident. <br />�T2 . nc surfacing, not critical yet. <br />13 Drainfie is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br />immediately. Repairs muet be completed within 90 days. <br />14 Draintield extent and condition unknown. <br />LIMITING SITE FACTORS (slope setbacks etc. : <br />POTENTIAL FOR SYSTEM FAILURE (depends on soils.water table etc.): <br />Note: In the rvent that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br />property, be advised that this report does not guarantee or certify that an existing system will continue to function <br />properly, but is merely an opinion of the adequacy t., the system under current conditions based on the available <br />information. <br />This report must be kept on the premises with the system location and pumping records. <br />WHITE COPY Inspectors File YELLOW COPY Homeowner <br />