Laserfiche WebLink
CITY OF ORONO <br />Municipal Offices <br />Post Office Box 66 <br />Crystal Bay, MN 55323-0066 <br />ON —SITE SE1fAQE TREATNZNT <br />INSPECTION REPORT <br />I ^-�Y77�pal sj� <br />Permit af's: Dates: l�L� t5/ Contractors: Emr � <br />City ordirvnce rxnmmber 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. <br />The on -site sewage treatment system at the above address has been inspected and appears to fall into the category <br />checked below. <br />(This is Pd an existing system ( ) new construction) <br />"CODE SYSTEM" -A system which meets all the location, design, and construction standards of the current City <br />Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br />without discharging any pollutants into ground or surface waters. <br />"CONFORMING SYSTEM' -A system which does not meet all the location, design, and construction standards of the <br />current City Codes but was installed according to the code in effect at the time of installation, and which <br />is operating satis�ectorily by treating and disposing of the entire current sewage input without discharging <br />any pollutants into ground or surface waters. <br />"NOM-CONFORMING Sy <br />STEN"•A prohibited system; a system located within a designated 100-year floodplain; any <br />system which any or may not meet all the location, design, and construction standards of the current City <br />Codes and which is failing for any reason; and any system with less than 3 feet of unsaturated soil or sand <br />between the distribution device and the limiting soil characteristics. <br />(The limiting soil characteristic has or ( ] has not been identified at this time. If the limiting soil <br />characteristic has not been identn mid, this classification may be subject to revision.) <br />T#r# inspection indicates <br />(y Ptmpout not needed at tr time. <br />6 Solids accumulation in tanks indicates they should be )sd out this year to help prevent future problems. <br />7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. <br />B System is discharging to the surface. Tanks must be pummpei out within 4i3 hours to eliminate surface discharge. <br />9 Inspaction risers missing -tanks cmild not be inspected. Inspection risers (4" dia. pipe) must be installed in each <br />tank at next pumpout. If tanks have not been pumped out within the last three years, they should be pumped <br />out now. <br />10 Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation). <br />if tanks have not been pumped out within the last three years, they should be pumped out now. <br />Drainfield inspection indicates: <br />11 Drainfield is dry, no surfacing evident. <br />]�y Sam evidence of surfacing, not critical yet. <br />Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br />immediately. Iopsirs must be completed within 90 days. <br />14 Drainfield extent and condition unknown. <br />LIMITING SITE FACTORS (slo9*.setbacks.etc.): <br />POTENTIAL FOR SYSTEM FAILURE (depends on soils.water table.etc.): <br />laia:; 1;1-44*43 <br />Note: in the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br />property, be advised that this rport does not guarantee or certify that an existing system will continue to function <br />pprroperly but is merely an opinion of the adequacy of the system uder current conditions based on the weilable <br />1nformstion. <br />This report must be kept on the premises with the system location and pumping records. <br />MIINTft C0Pllilmmgaslers FNs YELLOW COPVlmowsoawwx <br />