My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4330
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 4300 - 4399 (May 24, 1999 - December 13, 1999)
>
Resolution 4330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 1:18:00 PM
Creation date
11/17/2015 1:18:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , �� . <br /> � � <br /> � O� <br /> • O O <br /> b - CITY of ORONO <br /> � � ti <br /> � G'� � RESOLUTION OF THE CITY COUNCIL <br /> � �9k'ESI3�4�' . � , :� NO. d � � ,� . . . <br /> 17. The City Engineer has recommended the establishment of vegetated buffer strips on <br /> each lot to provide additional runoff filtration, since not all runoff from development <br /> of the site will be treated by the stormwater pond. <br /> 18. The Planning Commission� reviewed the application on 7uly 19, 1999 and <br /> recommended approval by a vote of 7 to 0 to approve the seven lot subdivision of <br /> land located at 555 Stubbs Bay Road. <br /> NOW, TH�RE�'OR�, BE IT RESOL�ED, that based upon one or more of the <br /> findings noted above, the City Council of the City of Orono hereby approves the preliminary plat <br /> for Peter Andrea Co. located at 555 Stubbs Bay Road, legally described above per preliminary plat <br /> drawings by Mark S. Gronberg, a licensed surveyor of Coffin& Gronberg, Inc. dated May 13, 1999, <br /> revised July 2, 1999 subject to the following conditions: <br /> 1. A variance will be granted for the cul-de-sac to permit a temporary cul-de-sac 1,100 <br /> • � , feet in length where 1,000 feet is allowed. � <br /> 2. Lots 2, 3 and 4,Block 1 and Lots 1, 2 and 3, Block 2 shall access to the private road <br /> in Outlot A. No direct access to Stubbs Bay Road shall be allowed for any Lot. <br /> 3. The private road in Outlot A shall be constructed to City private road requirements, <br /> subject to a Developers Agreement to be executed between the City and the <br /> developer. Private road construction can begin as soon as the engineering plans for <br /> the road as well as stormwater management plans have been approved by the City <br /> and the Developers Agreement has been executed. <br /> 4. Private road access sha11 be from Stubbs Bay Road subject to conditions for such <br /> access to be approved by the Director of Public Services. . <br /> � 5. The private road shall be privately owned and maintained per the appropriate access <br /> easement/maintenance documents to be executed by the developer. The developer <br /> � shall create a homeowners association for such ownership and maintenance. The <br /> homeowners association shall also be responsible for maintenance of all stormwater <br /> facilities serving the subdivision, including the pond located over Lot 4,�Block 1. <br /> 6. No building permits will be issued until the private road is completed and all � <br /> stormwater management improvements have been completed by the developer and <br /> • approved by the City. <br /> � Page 4 of 8 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.