My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-03 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
793 Ferndale Road North - 36-118-23-12-0016
>
Septic
>
1989-10-03 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 3:31:00 PM
Creation date
2/12/2026 3:25:10 PM
Metadata
Fields
Template:
x Address Old
House Number
793
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
793 Ferndale Road North
PIN
3611823120016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U}4--1eAz> <br />-71 <br />S-P TESTING, INC. <br />951 KATYDID LANE <br />ST. MICHAEL, MN 55376 <br />497-3566 <br />Steven B. Schirmers <br />October 3, 1989 <br />Paul Bayke <br />Lot 1, Block 1 F. 1/2 <br />Lauranne Woods <br />Orono, Henn. Co., MN <br />This system is Designed for a Type 1, four bedroom home and in accordance <br />with the Minnesota Pollution Control Agency Chapter 7080 and local <br />ordinances. <br />The soils on this site are typical of SCS soils mapped - HID - Hayden <br />Complex. A seasonally high water table was located at 46" & 4811, <br />(mottled soil). A shallow trench system may be installed (future <br />expansion area) 12" deep with a minimum of 12" of loam cover over <br />the rock. The soil surface between the trench must be turned over <br />typical of a mound system. <br />The soils at a depth of 12" have a percolation rate averaging 7.9 <br />min/inch and are adequate for treating septic effluent. <br />A pumping chamber will need to be installed to lift the effluent to the <br />treatment area. <br />The power supply and switches must be located outside the manhole and <br />pumping chamber in a weather proof enclosure. A warning device must be <br />installed with a light and sound device, this is in case of a pump failure. <br />(Mercury floats are a good method). The supply line pipe must have back <br />drainage to the pumping chamber. <br />The present syst�-m is functioning properly at this time. Testing was <br />copmleted for the future expansion area for the existing house. The <br />existing system is a shallow trench system 12" deep with 2-1000 gallon <br />tanks. <br />All neighboring wells are located more than 100' away from the proposed <br />treatment area & 75' away on this site. <br />Keep all heavy equipment off of the proposed treatment area before and <br />after construction as much as possible. The treatment area should be <br />marked off before construction. <br />CONT'D <br />Soil and Percolation Testa <br />Septic System Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.