Laserfiche WebLink
CITY OF ORONO <br />Municipal Offices <br />Post Office Box 66 <br />Crystal Bay, MN 55323-0066 <br />ON —SITE SEWAGE TIZATHENT <br />INSPECTION REPORT <br />Owner: l� TY//�y �i"l�l�`�►'� Address: <br />Permit #' a: n I Li ti Dates; // :%y Contractors: <br />City ordinance number 100 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. <br />The on -site sewage treatment system at the above address has been inspected and appears to fall into the category <br />checked below. <br />(This is 0 an existing system ( 1 new construction) <br />"CODE SYSTEM11-A system which meets all the location, design, and construction standards of the current City <br />Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br />without discharging any pollutants into ground or surface waters. <br />"CONFORMING SYSTEM" -A system which does not meet all the location, design, and construction standards of the <br />current City Codes, but was installed according to the code in effect at the time of installation, and which <br />is operating satisfactorily by treating and disposing of the entire current sewage input without discharging <br />any pollutants into ground or surface waters. <br />"NON -CONFORMING SYSTEM" -A prohibited system; a system located vithin a designated 100-year floodplain; any <br />system which may or may not meet all the Location, design, a: construction standards of the current City <br />Codes and which is failing for any reason; and any system with . -s -han 3 feet of unsaturated soil or sand <br />between the distribution device and the limiting soil characteris S. <br />(The limiting soil characteristic A has or I ) has not been ide.tified at this time. If the limiting soil <br />characteristic has not been identified, this classification may be subject to revision.) <br />TANK CONDITION (5-10): L <br />Tank inspection indicates: <br />5 Pumpcut not needed at this time. <br />6 Solids accurrilation in tanks indicates they should be pumped out this year to help prevent future problems. <br />7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. <br />8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br />9 Inspection risers missing -tanks could not be inspected. Inspection risers (4" dia. pipe) must be installed in each <br />tank at next purpout. If tanks have not been pumped out within the Last three years, they should be pumped <br />out now. <br />Inspection pipe is located directly over tank baffle (does not give accurate measurement of solids accumulation). <br />If tanks have not been Pumped out within they should be pumped out now. <br />D' field inspection indicates: <br />Drainfield is dry, no surfacing evident. <br />TSome evidence of surfacing, not critical yet. <br />13 Drainfield is saturated and visibly discharging untreated effluent to the surface Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />14 Drainfield extent and condition unknown. <br />LIMITING SITE FACTORS (slope.setbacks.etc.): <br />POTENTIAL FOR SYSTEM FAILURE (depends on soils.water table etc.): <br />Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br />property, be advised that this report does not guarantee or certify that an existing system will continue to function <br />properly, but is merely an opinion of the adequacy of the system under current conditions based on the available <br />Information. <br />This report must be kept on the premises with the system location and pumping records. <br />WHITE COPY Inspectors File YELLOW COPY Homeowner <br />