Laserfiche WebLink
SITE EVALUATION REPORT APR 1 <br />FOR PEGGY PITMAN Q ,,)89 <br />OF LOT 2, BLOCK 1, JANET ACRES <br />ORONO, MINNESOTA ill <br />1 1 :; <br />Additional information follows for the design of a pressure <br />mound system needed for the above property. In addition, two septic <br />tanks of at least 1000 gallons are needed.and a third pumping tank <br />of at least 750 gallons is required to house the pump. An alarm de- <br />vice should _be used to warn of pump failure. <br />All construction and materials must adhere to the provisions <br />of the City of Orono. No grading or construction traffic is permit- <br />ed on both the primary and the alternate drainfield sites. Runoff <br />water must be diverted from the mound area. <br />If any other information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />/A.4.z-1 <br />bark S. Gronberg <br />