Laserfiche WebLink
I <br />SITE EVALUATION REPORT <br />FOR PEGGY PITMAN <br />OF LOT 2, BLOCK 1, JANET ACRE <br />ORONO, MINNESOTA <br />�odIE <br />UDEC 2 7 M <br />Additional information follows for the design of a pressure <br />mound system needed for the above property. In addition, two septic <br />tanks of at least 1000 gallons are needed and a third pumping tank <br />of at least 750 gallons is required to house the pump. An alarm de- <br />vice should be used to warn of pump failure. <br />All construction and materials must adhere to the provisions <br />of the City of Orono. No grading or construction traffic is permit- <br />ed on both the primary and the alternate drainfieId sites. Runoff <br />water must 5e diverted from the mound area. <br />If any other information is n?eded, please contact me. <br />Sincerely, <br />PERCOR. INC. <br />Mark S. Gronberg i <br />