My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-1987 Council Packet
Orono
>
City Council
>
1987
>
02-09-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 1:29:35 PM
Creation date
2/3/2026 1:22:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF A PLANNING C MMISSION MFETING HELD ON SEPTF218ER 11, 1978 <br />The Orono Planning Commission met on the above date. <br />ATTENDANCE <br />Present were Chairman Hassel, Hurr, Hannah, F 'im, - <br />7:30 P.M. <br />McDonald and Hamnerel. Alan Olson (City Plat—er), <br />Jean Mabusth (Asst. Zoning Administrator), and Ji-, <br />, <br />Olson (City Engineer) were also present. <br />Chairman Hassel announced this was the time and place <br />ROY HOLLANDER <br />for a Public Information Meeting on Mrs. Hollander's <br />225 Sixth Avenue No. <br />subdivision regliest. Mrs: Hollander and her engineer <br />SUBDIVISION <br />(Jerry Hauer) were' present. Mr, and Mrs. John <br />Public Info. Meeting] <br />Guthrie were present from the public. Alan Olson <br />7:30 P.M. _ 7:50 P.M. <br />stated he had the Affidavit of Publication ar:' <br />((i412) <br />Certificate of Mailing. No changes have be-n made <br />since preliminary approval. Mrs. Hollander will <br />proceed with the private road. There are no septic <br />problems although Lot 1, Block 2 will require a <br />mound system. The County has completed their review, <br />but we have not received their written comments. <br />They will require relocation of the proposed curb <br />cut onto Highway 6, Consequently, Mr. Hauer <br />presented a revised plat which conforms to the County <br />requirements. Mr. and Mrs. Guthrie's main concerns <br />were in --gard to the road construction and the <br />effect � new wells on a spring fed lake in the area. <br />There was home discussion regarding completing the <br />road with the first phase, maintenance of tb- road <br />either by a homeowner's associ2*'an or a ma :enance <br />covenant, filling of wetlands a.,d the phasing of the <br />development, <br />[Tassel recommended preliminary plat approval subject <br />to the following conditions: <br />Preliminary approval of e.-,ht lots it, first phase, <br />Lots 1-4, Block 1 and Lots t-4, Block 2. ' ,sed <br />road to be platted through from east to we: <br />Remaining land area to be platted as two outlots, <br />one containing the existing buildings (includes <br />3 dwellings) the other outlot containing the <br />remaining land south and east of the proposed road, <br />said outlots to have a moratorium on all construction <br />until they are properly divided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.