My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-1987 Council Packet
Orono
>
City Council
>
1987
>
02-09-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 1:29:35 PM
Creation date
2/3/2026 1:22:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mrs. Roy Hol ader <br />255 Sixth Avenue North <br />Subdivision <br />Page 3 <br />PLANNING COMMISSION MEETING - SEPTEMBER 11, 1978 (Public Information Mtg.) <br />Mrs. Hollander, her engineer (Jerry Hauer) and Mr, and Mrs. John <br />Guthrie were present. The discussion included lot sizes, access, the <br />new roadway and phasing of the development. The Planning Commission <br />was advised of Hennepin County Highway Department's requirements <br />including a relocation of the proposed curb cut onto Highway 6. <br />Consequently, Mr. Hauer presented a revised plat which conforms to <br />the County requirements. <br />Planning Commission recommended preliminary plat approval subject to <br />the following conditions: <br />1. Preliminary approval of eight (8) lots in first phase: Lots 1-4, <br />Block 1 and Lots 1-4, Block 2. Proposed road to be platted <br />through from east to west. Remaining land area to be platted <br />as two outlots; one containing the existing buildings (includes <br />three dwellings), the other outlot containing the remaining land <br />south and east of the proposed road, said outlots to have a <br />moratorium on all construction until they are properly divided. <br />2. Proposed new road to be a private road, gravel surfece, 24 ft. <br />wide, according to the requirements of the City engineer, including <br />upgrading of the existing west driveway as used by this division. <br />Road either to be constructed through entire pl:t or provided with <br />a temporary cul-de-sac at the end of the first phase lots. <br />Subject to standard underlying road and utilities easement and <br />roadway maintenance covenants. <br />3. New road curb cut location to be as permitted by Hennepin County. <br />No direct access to County Road 6 from any block 1 lots platted <br />at this time. Minimum County road right of way 50 ft. from <br />centerline. <br />4. Septic system approval is for Lots 1-4, Block 1 and Lots 1-4, <br />Block 2 (first phase) only with Lot 1, B1nck 2 requiring a <br />mound system due to high water table. Additional testing <br />required before platting of second phase lot.. <br />5. Flowage and Conservation Easement over all wetlands. All wetlands <br />to be platted as ouclots or "drainage easements" on the plat. <br />6. Garage on Lot 7, Block 1 and all other buildings to meet all <br />setback requirements or they must be moved or removed. <br />7. Park dedication fee due on all platted lots. <br />
The URL can be used to link to this page
Your browser does not support the video tag.