Laserfiche WebLink
Private Property In{]ow And Infiltration Inspection Procedures <br />For Contractors <br />Sewer 5e►•vice Further Investigation Issues <br />Properties found in need of further investigation have one or more of the fol lowing: <br />• unable to access sewer lateral due to t►n-located cleanouts (behind walls, under flooring, etc) <br />• unable to complete inspection of sewer lateral due to roots, solid deposition, crushed pipe, etc <br />• unknown connections (unable to verify connection flowing water into sewer lateral) <br />Sump Punip/Roof Leader Inspection Criteria And Process <br />• Inflow/Infiltration Compliance Inspection form •Correctly plumbed sump pump discharges <br />must have the "Sump Ptiinps" and "Foundation outside of the building using rigid pipe. Pipe <br />Drains" sections completely filled out for the discharge should be a minimum of 10-feet from <br />inspection to be complete. building. <br />• Every sump pump on the property is required to •Sump pumps that do not discharge outside <br />be inspected (including photos of the opened are incorrectly plumbed and are considered <br />baskefi, the surrounding area, and the .discharge non -compliant. <br />pipe, both interior and exterior). Total number of •Roof leaders ate required to discharge outside <br />sump pumps must be noted. � of the building; any roof leaders and or cisterns <br />• Sump pump discharge piping is required to be discharging into foundation drains are non- <br />rigidpipe. Flexible pipe, shut off valves, compliant: <br />lumbin tees, and es are not allowed. <br />Completed Inspection � � , � �... � . <br />• Property owner is to sign the completed •The City will issue either a Certificate of <br />Inflow/Infiltration Compliance Inspection form and Compliance or a Correction Notice once the <br />retain a copy .for their records. � � review is complete. If a correction notice is <br />• A copy ofthe completed Inflovrlinfiltration issued, the required repairs must be made and a <br />Compliance Inspection form and video link is � post repair televised inspection must be <br />required to be delivered to the City of'Orono for performed in•order to receive Certificate of <br />review. � Compliance. <br />• The City's Utilities Supervisor or his/her •The completed forms will be mailed to the <br />designee will review the video and compare it with � address on the lnflow/Infiltration Compliance <br />the completed Inflow/Infiltration Compliance Inspection form, unless a different address is <br />Ins ection form noted. <br />"Contractor's Signature" - � � � . <br />Contractor completing the Inflow and Infiltration Compliance Inspection has read and <br />understands the conditions ofthe Private Properly lnflow and, Infiltration Inspection Procedures <br />for Contractors. <br />Company name Inspector name . <br />.-. ` wE2 � r+a01,N C,LfGAlU1 �a S�4 i�a� <br />Copy of plumbers license � . <br />On .file Ll � ZG �2�{ f �ir) Attached <br />License number � - Bond Date <br />. ,. <br />• SEGV � � . <br />�tail''Use burl + , ; �; � ;' � .. .. .. . . <br />.r.,,.hr.., Ay. <br />• • .Date Received; Staff dame and Signature <br />. - Page 2 of 2 <br />�- <br />