My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1555 Orchard Beach Place - Point Of Sale Inspection - Compliant
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Beach Place
>
1555 Orchard Beach Place - 07-117-23-43-0025
>
Point of Sale
>
1555 Orchard Beach Place - Point Of Sale Inspection - Compliant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2026 2:25:08 AM
Creation date
1/30/2026 2:43:26 PM
Metadata
Fields
Template:
Address
Street Name
Orchard Beach Place
House Number
1555
Address
1555 Orchard Beach Place
PIN
07-117-23-43-0025
Address Doc Type
Point of Sale Inspection - Compliant
Section
Point of Sale
Retention Effective Date
12/16/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k �• /Ob / 0 3 <br />Date Called in <br />DateScheduled <br />ol—lro—.15 <br />City Of Orono <br />Point of Sale Sant Sewer Service I&I Compliance Inspection Form <br />Property Address: ALM PA L <br />PID: <br />Owner Information <br />Name <br />W rjA S d G <br />Mailing Address: <br />(if dinerent from <br />Pm Oly <br />Plione <br />JqSZ Q S '(d <br />Email: <br />✓MA X4 Orr, <br />Ins ector luformation <br />Name: <br />C= � aOrti tni n <br />��a� <br />w <br />, <br />� In G1��n I �► <br />License number: <br />Phone: Z <br />Email: <br />I <br />S stem Standard Pass Fail <br />Roof Drains Roof drains and leaders Rbof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof 1 <br />drains are connected to the sanitary sewer, disconnect them, plug any open /}(` <br />connections to'the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br />Foundation Foundation drains are underground pipes that collect storm water from <br />Drains around the base of a building and into a sump basket, where it is then <br />pumped outside of the building. Foundation drains should not be connected A 1A <br />to the sanitary sewer. <br />Sump Pumps Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump / <br />system includes drain tile, a sump pit, a sump pump, a float or switch. and a �V <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service Sanitary Sewer Inflow & Infiltration (I/1) Compliance Inspection Sanitary <br />Line Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. (Details on backof this sheet) <br />Notes: ThSp.ta+td Qy Cty /Z-I•Zo2S <br />ViAto ►rev;cw pasSzA mspeCh�tvi —:n"v ty rtetFwi, <br />V+ikiaiit5 5veevviSoV <br />Com liant . <br />C) Corrective Action Re, uired <br />Certificate of Compliance Expires: I <br />orrec iv Action Due by: <br />Date: <br />I g I <br />Si nature:' <br />a�o257� 1 <br />Name: olb <br />i L w" e <br />Service Line Inspection Details <br />IS. cowl <br />
The URL can be used to link to this page
Your browser does not support the video tag.