My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
620 Big Island - 22-117-23-31-0032
>
Land Use
>
92-1745, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 2:39:47 PM
Creation date
1/29/2026 2:38:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />OWNER -PERMIT NO.'S. DATES <br />ADDRESS <br />On the North Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />CONTRACTORS <br />City Ordinance No. 210 requires that each on-site sewage treatment system in Orono be inspected on a regular basis. The on-site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is 6a an existing system D new construction) ~ ~'€..,, <br />□, <br />02 <br />Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />Does not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. * 12314 <br />System may or may not meet current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION_( Q'l Checked items may require your action) <br />Tank inspection indicates: <br />D Pumpout not needed at this time. <br />D Solids accumulation in tanks indicates they should be pump- <br />ed out this year to help prevent future problems. <br />D Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />D System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />D Inspection risers missing-tanks could not be inspected. <br />Inspection risers (4" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />D Slope <br />0 Soil <br />::0, High water table <br />□.Lot size <br />:2} Lake, wetland, or stream <br />D Drainage <br />Date of Inspection <br />D Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Drainfield inspection indicates: <br />D Drainfield is dry, no surfacing evident. <br />D Some evidence of surfacing, not critical yet. <br />D Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions-to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />D Drainfield extent and condition unknown. <br />Site Capabilities for <br />Future Expansion <br />D Adequate <br />@.Fair <br />D Poor <br />D Inadequate <br />Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report must be kept on the premises with system location and pumping records. <br />WHITE COPY/ Inspector's File GOLD COPY/ Homeowner
The URL can be used to link to this page
Your browser does not support the video tag.