My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
620 Big Island - 22-117-23-31-0032
>
Land Use
>
93-1785, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 2:35:20 PM
Creation date
1/29/2026 2:33:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />Permit I -------- <br />Fee$ ---------- <br />Entered By ------- <br />The General Contractor will be given a copy of this report and is <br />responsible for its distribution to all sub-contractors. SEPTIC SYSTEM <br />DESIGN IS NOT. CONSIDERED AS APPROVED UNLESS TfrIS SHEET IS ATTACHED. <br />LOCATION, Us I 11; IS; It: o/-I 7 f!Jj b>lcvii <br />GENERAL CONTRACTOR: PHONE: ----------------------------- <br />SEPTIC CONTRACTOR: ---------------------- <br />0 ~: £av,rl wdso~ <br />PHO~• <br />~lf/--'1313 <br />PHO ~-/60 <br />0 APPROVED <br />,.g__coNDITIONALLY APPROVED: (Note Changes Below) <br />CDMMENT,S: A le:Jal Q/!Yi"J?Wt'nh re111(reJ priOY-jp . . oP a g?rfrc <br />perm¾: evnceicn IY:J PC/Sf1ne,rl; ma,ob,-.c'RJ ard ~ l.!Qi19e.-, <br />NOTICE TO INSTALLERS: Any changes to the ap~roved plans and specs must have prior <br />approval of the Inspector (473-7357). Call for inspections 24 hours in advance. <br />NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected <br />prior to and after system installation to avoid compaction of the natural soil. <br />ALL DR.A.INFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must <br />remain in place until final site grading. Approval to pour footings will not be granted <br />until the Inspections Department has verified that primary and alternate sites are <br />adequately protected. <br />HO VEHICULAR TRAFFIC OF ANY ICIND (cars, trucks, earth moving equipment, etc.) is allowed <br />within 20' of tested drainfield sites either before or after system construction. This <br />applies to the lot you are working on and all adjacent lots. You could be held liable for <br />damaging sites on neighboring lots. <br />VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UBUSABLE. <br />Evidence of traffic on drainfield sites may be cause for revocation of building permits. <br />Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued. <br />Date Approved
The URL can be used to link to this page
Your browser does not support the video tag.