My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
560 Big Island - 22-117-23-31-0002
>
Land Use
>
06-3229, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 10:57:40 AM
Creation date
1/29/2026 10:45:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
seasonal due to the location on an island and qualifies as a Classification II dwelling; Minnesota Rules <br />Chapter 7080.0125. The estimated daily flow from the residence is 300 gallons per day. <br />Description of the Treatment Process - <br />• Primary Treatment -Sewage is gravity discharged from the house to a septic tank. Natural <br />biological activities taking place inside of the septic tank will separate solids and suspended particles. <br />Solids are reduced to some extent through this process. <br />• Final Treatment -Effluent flows to a new 528 square foot drain field. As the effluent trickles down <br />into the soil biochemical processes remove harmful viruses and bacteria. <br />Description of Treatment System -(See figures, design sheets, and data sheets for additional detail.) <br />• Septic Tank -(1) 1,500 gallon two compartment fiberglass septic tank. Install septic tank per <br />manufacturer's recommendations. <br />• Septic Tank Risers -24" diameter heavy corrugated PVC pipe. A watertight seal must be <br />created between top of tank and the each riser. <br />• Septic Tank Riser Cover -24" diameter fiberglass cover with gasket. Tank riser covers should <br />include insulation. Do not bury riser cover. <br />• Drain Field -Excavate the drain field trenches as depicted on Figure 2 when the soil is less than <br />the plastic limit to prevent smearing and compacted. Installer is responsible for determining if the soil is <br />below the plastic limit prior to excavation. Depth of excavation shall be 1.5 feet on the downhill side of <br />trench, scarified and leveled. Place Quick4 High Capacity Infiltrator® Gravelless Chambers in the <br />trench bottom connected by gravity drop boxes. <br />• Grading -Back fill with native soil, seed for cover, and mulch for erosion control ASAP after <br />installation. Create positive drainage away from the septic tank and drain field, allow for soil settling. <br />Do not allow channeled runoff over the drain field; create drainage swales along the outer edges of the <br />drain field to prevent excess runoff on the drain field. <br />Limitations -Our investigation, layout, design, and recommendations are based on data submitted. If <br />conditions considerably different from those described in this report are encountered, we must be <br />notified. If proposed construction is changed, we must be notified to evaluate the effect of the changes <br />on the wastewater system. Any changes to the design must be approved by the designer and will be <br />assessed additional design costs. If changes are made to the design without the knowledge and approval <br />of the designer the design shall be void. All construction is to be in accordance with the ISTS <br />regulations. Pipe type and size, installation requirements, septic tank construction, and other <br />specifications not depicted in our report are to conform to ISTS regulations. The installer of the system <br />is to be licensed by the Minnesota Pollution Control Agency. <br />I certify that this plan, document or report was prepared by me or under my direct supervision and that I <br />am a duly licensed Professional Soil Scientist and Designer 1 under the laws of the State of Minnesota. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.