My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-07-02 On Site Sewage Treatment Inspection Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
525 Ferndale Road North - 36-118-23-14-0005
>
Septic
>
1990-07-02 On Site Sewage Treatment Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2026 11:54:42 AM
Creation date
1/28/2026 11:51:59 AM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
525 Ferndale Road North
PIN
3611823140005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On tbi-Norlib Show oJ <br />l.akt' .Nrur/rronkrr <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER r � -- - ADDRESS�.J�lJlea:1"._ <br />PERMIT NO.'S. -- - DATES CONTRACTORS -- <br />City Ordinance No. 210 requires that each on site sewage treatment system in Orono he inspected on a regular basis. The on site sewage <br />treatment system at i--e above address has been inspected and appears to fall into the category checked below. <br />ITh.s is Cq an existing system [3 new construction) <br />D1 Me,ts or exceeds current City standards in all respects relating to design, construction, and location Appears to he operating <br />properly <br />(� 2 Does not meet all current City standards for n.w construction 0978 Code) but in most respects appears to Ix- designed, <br />IG�J located, and constructed generally in accordance with previous codes. System appears to he functioning property, no major <br />upgrading of the system is required at this time. <br />❑ 3 Does not meet current City standards in many respects relating to design, construction, or location. Apfsears to be operating <br />adequately at this time. but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />4 System rttay or may not meet current City st-ndaids for design, construction or location, but is fading to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety harard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />,solacement procedures. If drainfietd replacement is necessary, soil testing will usually be required, and a design anti site plan <br />must be sufxnrr i for review ' our contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( l[0 Checked items may require ;our action) <br />Tank inspection indicates FJ Insuectron pipe is located directly over tank baffle (Does not <br />❑ Pumpout not needed at this time. give accurate measurement of solids accumulation.) If tanks <br />❑ Solids accumulation in tanks indicates they should be pump, have not been pumped out within the jest three years, they <br />ed out this year to help prevent future problems. should be pumped out now. <br />C: Solids accumulation in tanks is at a critical level. Tanks Drainfield inspection indicates <br />should be pumped out as soon as possible. Drainfield is dry, no surfacing evident. <br />❑ System is discharging to surface. Tanks must be pumped ❑ Some evidence of surfacing, not critical yet. <br />within 48 hours to eliminate surface discharge. U Drainfield is saturated and visibly discharging untreated <br />*49 Inspection risers missing —tanks could not be inspected. effluent to the surface. This condition may require replace - <br />Inspection risers 14" dia. pipe' must be installed in each tank ment or additions to dramheld. Contact the City Inspector <br />at next pumpout. If tanks have not been pumped out within immediately Repairs must be completed within 90 days. <br />the last three years, they should he Bumped out nowDrainfield extent and condition unknown. <br />SITE CHARACTERISTICS <br />Lin,;•mq Site Factors Potential for System Failure Site Capabilities for <br />❑ Slope (depends on soil types, water Future Expansion <br />❑ Sorl table, and system condition) ❑ Adequate <br />❑ High water table k Low LV Fair <br />❑ Lot ;ize ❑ Medium rI Poor <br />❑ Lake, wetland, or stream L7 High f 1 Inadequate <br />LJ Drairage L I System is causing visible <br />urrlars drarharns <br />COMMENTS <br />Date of inspection <br />Siotic System Inspector <br />Note In the event that this inspection repoit is us •d to satisfy the requirements for a mortgage or other transfer of property. be advised that <br />this report does not guarantee or certify that an e, ting system will continue to function property, but is merely an opinion of the adequacy <br />of the system under current conditinns based on the available mfurmation <br />This report must be kept on the premises with system location and pumping records <br />WHITE COPY e Inspector's File GOLD COPY / Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.