Laserfiche WebLink
ALL SANITARY SEWER CONNECTION CHARGES <br />1964-LS-1 (see attached map) $ <br />1956-LS-lA (see attached map) <br />LS-lB <br />1970-LS-1 (see attached map) <br />1973-1 (see attached map) <br />1981-1 (see attached map) <br />1980-1 Minnetonka Bluffs <br />Orono Lane <br />West Ferndale & Cty Rd 15 <br />Marina <br />North Shore Drive <br />1985-1-2 <br />Plus for 1987 <br />1984 FM & Lift Station #7 <br />1. Existing Properties/Increase <br />Sewer Usage -SAC Units <br />2. New Bldgs Replacing <br />Existing Bldgs <br />- by District <br />225.00 <br />225.00 <br />225.00 <br />$ 9,205.73 if not previously assessed <br />8,391.67 if not previously assessed <br />6,700.00 if not previously assessed <br />11,350.82 if not previously assessed <br />18,164.73 if not previously assessed <br />4,841.98 if not previously assessed <br />18,466.00 if not previously assessed <br />9,235.00 if not previously assessed <br />923.50 <br />To determine area see attached map <br />Initital #6 #7 <br />Charge By Pass Forcemain <br />Previously Previously $335 + 33.50/ <br />Paid Paid yr for each <br />yr after 84 <br />Previously Previously <br />Paid Paid <br />3. New Residential W/Existing Previously Previously <br />Paid Paid <br />4. New Residential Without Stub $225.00 $150 +15.00 <br />/yr for ea <br />yr after 84 <br />5. Freshwater Biological <br />ON -SITE SEPTIC SYSTEMS <br />Annual Service Charge <br />GRADING, EXCAVATION, FILLING <br />Design Review Fees (staff only) <br />$225.00 $150+15.00 <br />/yr for ea <br />yr after 84 <br />Page 2 of 4 <br />If usage <br />increases from <br />from existing <br />$335 + 33.50/ <br />yr for each yr <br />after 84 <br />$970 + 97.00/ <br />yr for each yr <br />after 84 <br />$970 + 97.00/ <br />yr for each <br />yr after 84 <br />$500/unit on <br />connection <br />(already <br />assessed <br />$2000/ac) <br />$ 20.00/system/year plus <br />An additional full fee for <br />late penalty plus 8% <br />interest for unpaid charges <br />certified <br />$ 30.00 minimum + <br />engineering fees <br />