My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4403
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4400 - 4499 (December 13, 1999 - July 10, 2000)
>
Resolution 4403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 12:19:28 PM
Creation date
11/17/2015 12:19:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> . - � <br /> • Mr. Tom O'Keefe. P.E. <br /> December 7, 1999 <br /> Page:2 <br /> 4. The design of the Wayzata Boulevazd/Highway 12 interchange has been maintained <br /> as the design that works best operationally in terms of the safe and e�cient <br /> movement of traffic. <br /> 5. The design provides no public ingress or egress to new Highway 12 anywhere along <br /> the corridor,except at the County Road 6 and Wayzata Boulevard interchange areas. <br /> Objectives to be Addressed During the Final Design Phase <br /> ' A number of the City's objectives are not a part of the preliminary design approval, but rather will <br /> be addressed during the final design phase. The objectives to be addressed during the final design <br /> phase are as follows: <br /> 1. Facilitate the free flow of traffic on what will be old Highway 12 by eliminating the <br /> semaphore at the intersection of Wayzata Boulevard and old Highway 12. <br /> 2. Preserve Orono Orchard Road as a local roadway serving local trips. <br /> • 3. Limit lighting along the corridor to the bridge and interchange areas only to minimize <br /> spillover of light from the corridor to adjacent properties. <br /> 4. Minimize the noise and vibration impacts of the new roadway and the relocated <br /> railroad. <br /> 5. The Water Resources Plan for the Highway 12 project includes an option to divert <br /> some stormwater flows to a stormwater pond in the location of the Long Lake sewer <br /> pond rather than directing all flows into Long Lake. Any diversion of stormwater <br /> must be limited to an amount that will not cause flooding problems downstream <br /> along Long Lake Creek,will not result in a reduction in the quality of water flowing <br /> out of the pond and into Long Lake Creek, and will not reduce the water level or <br /> water quality of Long Lake. <br /> 6. Coordinate the pedestrian/bike trail system being constructed along the Highway 12 <br /> corridor in Long Lake with the Orono trail system. Also consider trail opportunities <br /> . along the right-of-way in Orono, perhaps funded in whole or in part by ISTEA <br /> moneys. <br /> 7. Further discuss the real merits of a ramp meter on the eastbound ramp of the County <br /> Road 6 and Highway 12 interchange. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.