My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-07-12 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
511 Ferndale Road North - 36-118-23-13-0012
>
Septic
>
1993-07-12 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 3:00:49 PM
Creation date
1/22/2026 2:53:29 PM
Metadata
Fields
Template:
x Address Old
House Number
511
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
511 Ferndale Road North
PIN
1311823130012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P. TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, M' ' 176 • (612) 497-3566 <br />July 12, 1993 <br />Jim Pfleider <br />511 North Ferndale Rd. <br />Orono, Henn. Co., MN <br />This Or -Fite Sewage Treatment System is Designed for a Type 1 foils <br />bedroom home in accordance with the Minnesota Pollution Control <br />Agency Chapter 7080 and local ordinances. This Design is Revised <br />,from the plan dated December 21, 1992. A new site has been <br />Designed & will reed to be surveyed 6 approved to meet the City <br />of Orono's requirments. <br />The soils on this site are SCS soils mapped - HcB2 - Hayden clay <br />loam. A seasonally high water table was located at 36" to 40" <br />(mottled soil). Due to the seasonally high water table, a <br />Pressurized Mound System will need to be installed. The bottom <br />of the rock bed must be located at least 3' above the seasonally <br />high water table. <br />The soils at a depth of 12" have a percolation rate averaging <br />11.3 min/inch. <br />A pumping chamber will need to be installed to lift the effluent <br />to the treatment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material are clean. The sod layer below the <br />entire mounded area must be turned over, just break up the sod, be sure <br />riot to over work. <br />The power supply and switches must he located outside the manhole and <br />pumping chamber in a weather proof enclosure. A warning device must <br />be installed with a light and sound device, this is in case of a pump <br />failure. Mercury floats are a good method. <br />This site has an existing failing system with a seepage bed surface <br />discharging. The existing system is located off of the property. <br />The existing tanks may be used upon approval by the local Inspector. <br />CONT'D <br />
The URL can be used to link to this page
Your browser does not support the video tag.