My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-07-29 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
507 Ferndale Road North - 36-118-23-13-0007
>
Septic
>
1993-07-29 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 12:20:51 PM
Creation date
1/22/2026 12:08:23 PM
Metadata
Fields
Template:
x Address Old
House Number
507
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
507 Ferndale Road North
PIN
3611823130007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM <br />END PERFORATION OF A PERFORATED LATERAL <br />1. Select number of perforated laterals <br />2. Select perforation spacing = 2.5 feet <br />3. Since perforations should not be placed closer than 1 ft. to <br />the edge of the rock layer (see diagram), subtract 2 ft. from <br />the rock layer length. <br />Rork layer length - 2 ft. - feet <br />4. Determine the number of spaces between perforations. <br />Divide the length above by perforation spacing and round <br />down to nearest whole number. <br />Length perf. spacing =L ft. ft. _If C-1 <br />spaces <br />(#3) (#2) <br />5. Number of perforations is equal to one plus the number of <br />perforation spaces . <br />l9 spaces + I = 20 perforations per lateral <br />6. Multiply perforations per lateral by number of laterals to <br />get total number of perforations. <br />leterral a x peris7tenl= 60 perforations <br />7. Determine required flow rate by multiplying <br />number of perforations by flow per perforation <br />(,,P-fs x a-, f - gpm. <br />�-Grove CORM <br />-L <br />TOMeII <br />• <br />Loree of 1160=1le Foaelc (o. tow <br />• Lear" Sara Loses InU. IeyM er IIaY se .rya. <e.er.4 <br />.d. rya .-,. Paps., <br />Pertorol.on Drilled Helllonla 11, <br />.. Cap Hear Too <br />.• Plus <br />�Inla <br />AI Level 12�10 Edge <br />- Relit Race <br />of Racx Loner <br />'k-Perlarauode Lacoled at <br />Clfon SWd Loner <br />Bollom of Lateral <br />L Orlge,al soil Properly Scultied <br />Belle Plocino Sand Loro <br />TABLE OF PERFORATION DISCHARGE'S IN GPM <br />Head Perforation diameter (inches) <br />/p <br />/e <br />1.02 <br />0.56 <br />0.74 <br />1.5 <br />0.69 <br />0.90 <br />2.Ob <br />0.80 <br />1.04 <br />2.5 <br />0.89 <br />1.17 <br />3.0 <br />0.98 <br />1.28 <br />4.0 <br />1.13 <br />1.47 <br />5.0 1 <br />1.26 <br />1.63 <br />aUse 1.0 foot of head for residential systems. <br />bUsc 2.0 feet of head for other cstablietimen;s <br />Table 2 <br />Maximum allowable number of qualer inch perforations per <br />lateral to guarantee liar Discharta variation <br />perrwellee erl Ing! <br />1.25 inch <br />� inch 1.5 � 2.0 inch <br />tl�> <br />I <br />18 <br />2.5 <br />1 14 <br />3.0 <br />1 13 <br />17 <br />3.3 <br />I 12 <br />16 t� <br />4.0 I <br />11 <br />15 23 <br />5.0 ; <br />10 I <br />14 22 <br />8. If laterals are connected to header pipe as shown on upper <br />example, select minimum required lateral diameter from <br />table 2; enter table with perforation spacing and number <br />of perforations per lateral. Select minimum diameter for <br />perforated lateral = 2 inches <br />9. If perforated lateral system is attached to manifold pipe near <br />the center, as in lower example, perforated lateral length and <br />number of perforations per lateral will be approximately one <br />half of that in # 6. Using these values, select minimum <br />diameter for perforated lateral from table 2 <br />perforated lateral = inches <br />--� <br />/ �. •� licir - <br />•'rleturca <br />
The URL can be used to link to this page
Your browser does not support the video tag.