My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-08-13 Application for Septic Permit
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
503 Ferndale Road North - 36-118-23-13-0005
>
Septic
>
1996-08-13 Application for Septic Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 3:38:36 PM
Creation date
1/21/2026 3:30:51 PM
Metadata
Fields
Template:
x Address Old
House Number
503
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
503 Ferndale Road North
PIN
3611823130005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.�� <br />4.5 's <br />CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br />Box 66 (2750 Kelley Parkway) <br />Crystal Bay, NIN 55323 <br />JOB SITE ADDRESS: r03 A1.1 n Dn[ e / J J ti%to tL. <br />Occupancy Type: Residential_ Commercial Other <br />Permit Type: New or Replacement System, $100.00 X <br />Repair Existing System, $ 50.00 <br />(Tanks or Drainfieid) <br />0.50 State surcharge added to above fees <br />*See fee schedule for non-residential permit fees <br />Owner's Nance: ��) i �L �,�� L, o< Phone Number: <br />Mailing Address: '50-1 City: <br />Contractor's Name: 5_ r r , << f ; -1 s c,-vie so Phone Number: v a c, <br />Mailing Address: City: w4 4 2 `i lg apc •_� <br />DO NOT MAEL PAYMENT WITH THIS APPLICATION <br />GENERAL INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />Offices: however, permits will not be mailed out. The permit must be picked up in <br />person at the City Offices and work must not begin unless the permit card is on the job <br />site. <br />2. permits will be issued only to contractors holding a City of Orono Septic System <br />Installers License. <br />3. All work must be done in accordance with the approved septic system design. Design <br />reports are not considered approved unless accompanied by the "City of Orono Septic <br />System Approval" cover sheet signed by the City Inspector. <br />4. The following inspections will be required for all septic systems: <br />A. Pre -installation site inspection to include inspector, installer, and general contractor. <br />B. Tank installation prior to covering. <br />C. Drainfield trench installation prior to covering. For mounds, inspection is required <br />after rough -up but prior to sand placement (sand will be jar tested for silt content), <br />1W again during pressure distribution piping installation in the rock bed. <br />D. Final inspection to verify proper final cover depths and to verify that all pump station <br />(where required) components are functional and comply with codes. <br />5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br />hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.