My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-19 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
503 Ferndale Road North - 36-118-23-13-0005
>
Septic
>
1996-06-19 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 3:38:36 PM
Creation date
1/21/2026 3:28:17 PM
Metadata
Fields
Template:
x Address Old
House Number
503
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
503 Ferndale Road North
PIN
3611823130005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nwr SELEMQV PROCEDURE <br />A. Determine pump capacity- <br />Gravity Distribution <br />1. Minimum suggested is 600 gallons per hour (10 gpr,)) to stay ahead of <br />water use rate. <br />2. Maximum suggest for -delivery 10 a drop box of a home system is 2,700 <br />gallons per hot�5 gpm) to present build-up of pressure in drop box. <br />Pressure Distibution <br />3. a. Select number of perforated laterals <br />b. Select perforation spacing = feet- <br />C. Subtract 2 ft from the rock layer length. <br />�,�, 2 ft. = feet. <br />d. I�et__e the number of spaces between perforations. <br />Length perf. spacing = - ft. + ft. = spaces <br />e. _ spaces 1 = perforationsAatera! <br />f. Multiply perforations per lateral by number of laterals to <br />get total number of perforations. I,- x = perforations. <br />SELECTED PUiEP CAPACITY _y gpm 01 AL. <br />B. Determine head requirements: <br />1. Elevation difference between pump and point of discharge. <br />)� feet <br />2. If pumping to a pressure distribution system, five feet for pressure <br />required at manifold if gravity system, zero. <br />- feet <br />3. Friction loss <br />a. Enter friction loss table with gpm and pipe diameter. <br />Read friction loss in feet per 100 feet from table. <br />FA _= 2.al ft./100 ft of pipe <br />b. Determine total pipe length from pump to discharge <br />point. Add 25 percent to pipe length for fitting <br />loss, or use a fitting loss chart. Equivalent pipe <br />length - 1.25 times pipe length = <br />7 'L, x I.25 = ay J feet <br />c. Calculate total friction loss by multiplying <br />friction loss in ft/100 h by equivalent pipe length. <br />Total friction loss = --� � c) x ? '�' ✓ +100 = loe feet <br />4. Total head required is the sum of elevation difference, <br />special head requirements, and total friction loss. <br />l+ - + 4�1 <br />(1) (2) (30 <br />TOTAL HEAD D ?, feet <br />C. Pump selection <br />1. A pump must be selected to deliver at least <br />ti S gpm (Step A) with at least --:�_ feet of total head (Step B). <br />F-17 <br />ua PMORATlw a' • KRFORATtrD I=TCF&L <br />• lam, S.�r lM. � M f+„wr Frr, It/ v• <br />..r 77 <br />Requusd Perforabon D;, e <br />to gallons per ounute pm <br />lhscharge <br />Nead <br />(feet) <br />j= 0.6 "t <br />i .s 1w <br />1.0a <br />0.56 <br />0.74 <br />2.0b <br />0.80 <br />1.04 <br />a. Use for single family homes <br />b. Use for all other applications <br />Pipe Length <br />Point of Discharte <br />Elevation Diffemncc <br />Pump <br />F-18b <br />1.5 inch 2.0 inch 3.0 inch <br />gpm Fr.a m :m pv 100 h of <br />10 <br />0.69 <br />0.20 <br />12 <br />0.96 <br />0.28 <br />14 <br />1.28 <br />0.38 <br />16 <br />1.63 <br />0.48 <br />18 <br />2.03 <br />0.60 <br />20 <br />2.47 <br />0.73 <br />0.11 <br />25 <br />3.73 <br />1.11 <br />0.16 <br />30 <br />5.23 <br />1.55 <br />0.23 <br />35 <br />7.90 <br />2.06 <br />0.30 <br />40 <br />11.07 <br />2.6s <br />0.39 <br />45 <br />14.73 <br />3.28 <br />0.48 <br />5o <br />3.99 <br />0.58 <br />55 <br />4.76 <br />0.70 <br />60 <br />5.60 <br />0.82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.