My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
340 Big Island - 23-117-23-32-0076
>
Land Use
>
76-139, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 10:57:46 AM
Creation date
1/16/2026 10:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORONO COUNCIL MEETING HELD JULY 26, 1976 <br />Page 9 <br />Henry Pluhich, Building & Zoning Administrator, VARIANCES <br />stated that George Hanson, Big !sland is request- Big Island <br />ing variances for lot area, lakeshore setback, <br />street setback, and hardcover restrictions to <br />build a new home to replace the one that was <br />recently completely destroyed by fire on Lot F. <br />This proposal would be an improvement to the <br />previous situation in that the new location <br />is further from the lakeshore. <br />There should be some concern of precedence on <br />Big Island, however. Mr. Hanson also owns <br />Lots G & 3, which consist of an additional <br />17,771 sq. ft. We could also consider vacating <br />the street if access to other properties would <br />not be obstructed. The streets consist of an <br />area of approximately 9,000 sq. ft. If all this <br />area were combined, there would be a total of <br />approximately 55,000 sq. ft. (87,120 sq. ft. <br />required). Pie could, however, maintain the <br />required 75' setback from the shoreline. These <br />are only suggestions since I have never been <br />on the island. A site inspection will be <br />necessary before determining a reasonable solution. <br />The builder did indicate that the existing <br />drain field for the septic system is presently <br />located in the street area. <br />Planning Commission Meeting - June 21, 1976 <br />Suggested boat transportation be arranqed for <br />Planning Commission members to make site inspection <br />before determining decision on proposal. <br />Planning Commission meeting - July 19, 1976 <br />The Planning Commission recommended approval <br />of this variance subject to changes in the <br />plan whereby the two remaining substandard <br />parcels would be eliminated. Two alternative <br />suggestions were made: <br />1. dove the location of unnlatted street and <br />combine all three parcels, or <br />2. Grant to the City a conservation easement <br />over the two substandard lots. <br />Paurus moved, Butler seconded, to adopt Resolution RESOLUTION 14700 <br />#700, Resolution Granting Variance To George George llanson <br />Hanson To Allow The Construction Of A Home On Big Island <br />Big Island In The City Of Orono. Motion, Aycs (3) — <br />Nays (0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.