My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
280 Big Island - 23-117-23-32-0023
>
Land Use
>
88-1247, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 10:53:51 AM
Creation date
1/16/2026 10:51:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADVANCE SURVEYING & ENGINEERING CO. <br />5811 Cedar Lake Road, Minneapolis, MN 55416 <br />December 31, 1987 <br />Mr. Michael P. Gaffron <br />Assistant Planning & Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, Minnesota 55323 <br />Dea Mike: <br />Phone 541 0500 <br />We received your letter dated December 23, 1987 today. We <br />would like to clear up some misunderstandings that the <br />letter seems to indicate. We enumerate our responses to <br />correspond to the numbering in your letter: <br />1. We are aware that the longitudinal axis of a <br />typical mound system should be aligned with the contour <br />lines on site and that is our normal practice. The <br />underlying reason for this provision of the code is <br />that this practice gi:-s a maximum amount of ground <br />surface under the mound which is in the path of <br />downward percolating effluent (lets call that surface <br />the "wetable interface"). The effluent from the rock <br />bed percolates straight down from the rock bed until it <br />rraches the sand topsoil interface and then if the <br />underlying soil is less permeable than the sand, the <br />effluent will have to spread out to some extent to be <br />absorbed. Each drop of effluent which cznnot be <br />absorbed directly under the rock beds will proceed in a <br />downhill direction (at right angles to the underlying <br />contour lines) until the area wetted is sufficient to <br />absorb all the effluent. One goal of a mound design is <br />to provide the maximum "wetable interface" since if the <br />wetted arc« --equired to absorb the effluent exceeds the <br />"wetable interface" provided then hydraulic failure <br />will occur at the toe of the mound. <br />In the rather unusual case of this double moun:i, the <br />goal of providing the maximum "wetable interface" <br />best met by aligning the diagonal rather than ,e <br />longitudinal axis of the mound with the contour linc.6. <br />We enclose a diagram illustratir-4 this relationship. <br />This w - our motivation for the proposed alignm, and <br />the fact that this better fits the boundary lir: with <br />this alignment is a fortunate coincidence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.