|
140044 23/117/23 SUNCREST BUILDERS
<br />ADVANCE SURVEYING & EIVvfNEERING CO.
<br />5300 S. Hwy. No. IOI Minnetonka, MN 55345 Phone (952) 474 7964 Fax (952) 225 0502 W',\".\·.advsur.com
<br />SURVEY FOR: SUNCREST BUILDERS
<br />SURVEYED: February 11, 2014 DRAFTED: February 13, 2014
<br />~ February 19, 2014 to show elimination of retaining walls.
<br />LEGAL DESCRIPTION:
<br />Lots I, 2 and 3, SCRIVER'S SUBDIVISION OF LOT E MORSE ISLAND PARK and that part of
<br />Lot 6, Morse Island Park Second Addition that lies southerly of the following described Line "A":
<br />Line "A": Beginning at a point on the east line of said Lot 6 which lies 104.53 feet southerly of the
<br />northeast comer of said Lot 6; thence southwesterly along a straight line to the southwest comer of
<br />said Lot 6 and there terminating.
<br />All in Hennepin County, Minnesota.
<br />SCOPE OF WORK:
<br />l. Showing the length and direction of boundary lines of the above legal description. The
<br />scope of our services does ,!!Q!, include determining what you own, which is a legal matter.
<br />Please check lhe legal description with your records or consult with competent legal counsel, if
<br />necessary, to make sure that it is correct, and that any matters of record, such as easements, that you
<br />wish shown on the survey, have been shown.
<br />2. Showing the location of existing improvements we deemed important.
<br />3. Setting new monuments or verifying old monuments to mark the comers of the property.
<br />4. Showing elevations and contours to show the topography of the site. The elevations shown relate
<br />only to the benchmark provided on this survey. Use that benchmark and check at least one other
<br />feature shown on the map when determining other elevations for use on this site.
<br />5. While we show proposed improvements to your property, we not as familiar with your
<br />plans as you are nor are we as familiar with the requirements of governmental agencies as their
<br />employees are. We suggest that you re,iew the survey to confirm that the proposals are what you
<br />intend and submit the survey to such governmental agencies as may have jurisdiction over your
<br />project to gain their approvals if you can.
<br />6. While we show the building setback lines per the City of Orono's web site, we suggest you show
<br />this survey to the appropriate city officials to be sure that the setback lines are shown correctly. Do
<br />this BEFORE you use this survey to design anything for this site.
<br />STANDARD SYMBOLS & CONVENTIONS:
<br />" • " Denotes 1/2" ID pipe with plastic plug bearing State License Number 9235, set, unless
<br />otherwise noted.
<br />CERTIFICATION:
<br />I hereby certify that this plan, specification, report or survey was prepared by me or under my direct
<br />supervision and that I am a duly Licensed Professional Engineer and Licensed Land Surveyor under
<br />the laws of the state of Minnesota.
<br />Signature: ~ JC. tf>~ Typed Name: James H. Parker •
<br />Date: February 19. 2014 Reg. No.
<br />.LEC.£N.D
<br />EUSl'ING CONTOUR -----·883···----
<br />P.HOPOS:ED CONTOUR --883--
<br />P.HOPOS:ED ELEY,l:tTON/SPOF .6Z6'Y,'770H -883
<br />.IJ.IUfMJG.8' ,ueeor -JIZOr ==>
<br />--sr--
<br />I
<br />i , __
<br />!J<I --------------------------
<br />., .
<br />~ ,..
<br />-
<br />,,
<br />< -o >-. ,,
<br />-,..
<br />-,:;_
<br />()
<br />~-
<br />C)
<br />C)
<br /><(
<br />C)---r·· -,.. (1 -,:;_ I
<br />C) I ()
<br />L,J I
<br />(/) :ii
<br />\,✓
<br />I~
<br /><(
<br />I"\ LJ_
<br />g' -I
<br />I' I'-'
<br />I •
<br />/~-~ '1'91
<br />llq N ,a
<br />':.::
<br />--·-····-N.E. Cor.
<br />----LINE
<br />I
<br /><.o'),..
<br />I
<br />PC Exhibit B I
<br />Lot 6
<br />,, A,,
<br />140044 TB REV. 2-19
|