Laserfiche WebLink
140044 23/117/23 SUNCREST BUILDERS <br />ADVANCE SURVEYING & EIVvfNEERING CO. <br />5300 S. Hwy. No. IOI Minnetonka, MN 55345 Phone (952) 474 7964 Fax (952) 225 0502 W',\".\·.advsur.com <br />SURVEY FOR: SUNCREST BUILDERS <br />SURVEYED: February 11, 2014 DRAFTED: February 13, 2014 <br />~ February 19, 2014 to show elimination of retaining walls. <br />LEGAL DESCRIPTION: <br />Lots I, 2 and 3, SCRIVER'S SUBDIVISION OF LOT E MORSE ISLAND PARK and that part of <br />Lot 6, Morse Island Park Second Addition that lies southerly of the following described Line "A": <br />Line "A": Beginning at a point on the east line of said Lot 6 which lies 104.53 feet southerly of the <br />northeast comer of said Lot 6; thence southwesterly along a straight line to the southwest comer of <br />said Lot 6 and there terminating. <br />All in Hennepin County, Minnesota. <br />SCOPE OF WORK: <br />l. Showing the length and direction of boundary lines of the above legal description. The <br />scope of our services does ,!!Q!, include determining what you own, which is a legal matter. <br />Please check lhe legal description with your records or consult with competent legal counsel, if <br />necessary, to make sure that it is correct, and that any matters of record, such as easements, that you <br />wish shown on the survey, have been shown. <br />2. Showing the location of existing improvements we deemed important. <br />3. Setting new monuments or verifying old monuments to mark the comers of the property. <br />4. Showing elevations and contours to show the topography of the site. The elevations shown relate <br />only to the benchmark provided on this survey. Use that benchmark and check at least one other <br />feature shown on the map when determining other elevations for use on this site. <br />5. While we show proposed improvements to your property, we not as familiar with your <br />plans as you are nor are we as familiar with the requirements of governmental agencies as their <br />employees are. We suggest that you re,iew the survey to confirm that the proposals are what you <br />intend and submit the survey to such governmental agencies as may have jurisdiction over your <br />project to gain their approvals if you can. <br />6. While we show the building setback lines per the City of Orono's web site, we suggest you show <br />this survey to the appropriate city officials to be sure that the setback lines are shown correctly. Do <br />this BEFORE you use this survey to design anything for this site. <br />STANDARD SYMBOLS & CONVENTIONS: <br />" • " Denotes 1/2" ID pipe with plastic plug bearing State License Number 9235, set, unless <br />otherwise noted. <br />CERTIFICATION: <br />I hereby certify that this plan, specification, report or survey was prepared by me or under my direct <br />supervision and that I am a duly Licensed Professional Engineer and Licensed Land Surveyor under <br />the laws of the state of Minnesota. <br />Signature: ~ JC. tf>~ Typed Name: James H. Parker • <br />Date: February 19. 2014 Reg. No. <br />.LEC.£N.D <br />EUSl'ING CONTOUR -----·883···---- <br />P.HOPOS:ED CONTOUR --883-- <br />P.HOPOS:ED ELEY,l:tTON/SPOF .6Z6'Y,'770H -883 <br />.IJ.IUfMJG.8' ,ueeor -JIZOr ==> <br />--sr-- <br />I <br />i , __ <br />!J<I -------------------------- <br />., . <br />~ ,.. <br />- <br />,, <br />< -o >-. ,, <br />-,.. <br />-,:;_ <br />() <br />~- <br />C) <br />C) <br /><( <br />C)---r·· -,.. (1 -,:;_ I <br />C) I () <br />L,J I <br />(/) :ii <br />\,✓ <br />I~ <br /><( <br />I"\ LJ_ <br />g' -I <br />I' I'-' <br />I • <br />/~-~ '1'91 <br />llq N ,a <br />':.:: <br />--·-····-N.E. Cor. <br />----LINE <br />I <br /><.o'),.. <br />I <br />PC Exhibit B I <br />Lot 6 <br />,, A,, <br />140044 TB REV. 2-19