Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br />MINUTES FOR JUNE 15, 1998 <br />(#5 -#2361 William and LaWayne Yaeger -Continued) <br />The Yaegers are attempting to purchase Lot 65, and if successful. ,,ish to combine the two lots <br />into Rec-::rd Lot 15A. <br />Gaffron st~ted a cabin was constmcted on Lot 64, with the City issuing a stop work order for work <br />occuring ,vithout a building permit in July, 1997. The new cabin replaces a pre-existing cabin but <br />is in violation oflakeshore setback and hardcover regulations. The new cabin as constmcted requires <br />variances for lakeshore setback, side setback, 0-75' hardcover, and a full perimeter foundation. A <br />gaz..:bo located on the property was also built without a bui:iing pem1it and is in violation of the side <br />lot setback. Staff noted that the complete replacement of the pre-existing cabin eliminates any <br />grandfathered status that the old cabin may have enjoyed. <br />The Planning Commission was requested to consider whether Lot 64 should be designated as an <br />individual Record Lot separate from Lots 65-8-9-10-11, and if so, \\·hat variances should be granted to <br />allow the new cabin and gazebo to remain in their non-confom1ing locations. <br />City Staff is recommending that the Applicant acquire all six lots. and if not possible, to at least <br />acquire Lot 65 and combine it with Lot 64, then move the cabin and gazebo to conforming locations <br />75' from the lake. <br />Win Curtis, Attorney-at-Law, stated he had been asked to speak on behalfof the Yaegers in this <br />matter. The Yaegers have attempted to purchase all six lots to no a,·ail. and would no\\· like to <br />pursue Option #2, the purchase of Lot 65, combining it \\'ith Lot 6-L and then move the cabin and <br />gazebo to conforming locations 75' from the lake. <br />Curtis reported the septic system has not been installed due to the stop work order which was issued, <br />and the Yaegers are currently looking at three different options: ha\'ing a shared system on the property <br />to the south, install a septic system on Lot 65, or acquire an casement from the O\rner of <br />Lots 8-9-10-11 for purposes of a septic system. Curtis noted the septic issue could be dealt with at <br />a later time. <br />Gaffron stated the acquisition of Lot 65, combining it with Lot 6-L and then moving the cabin and <br />gazebo to conforming locations 75' from the lake was a good solution to the problem. and would <br />recommend the Planning Commission approve the application. <br />Curtis remarked the gazebo would not need to be relocated if Lot 65 \\'as acquired. Curtis noted <br />the property 0\'mer for Lot 65 is av,:are of tonight's meeting but is not in attendance. If the additional <br />lot is purchased, the Yaegers are asking for a 90 day time period in which to move the cabin. No <br />plumbing would be installed until the septic system was installed. <br />Lindquist moved, McMillan seconded, to approve Application #2361, contingent upon <br />purchase of Lot 65, legal combination with Lot 64, with such combination to henceforth <br />be designated as Record Lot #15. The Yaegers are required to move the cabin within <br />six months from the date of acquisition of Lot 65 to a position that meets the lake and side <br />setbacks, and to comply with all regulations regarding installation of a septic system. The <br />lot area variance is also recommended for approval. VOTE: Ayes 7, Nays 0. <br />(#6) 2376 RICHARD AND MARION BROWN, 2685 SHADYWOOD ROAD - <br />CONDITIONAL USE PERMIT, 9:28 p.m. -9:34 p.m. <br />7