My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-10-05 Letter, Change of Sewer Connect Required
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
225 Ferndale Road North - 36-118-23
>
Correspondence
>
1979-10-05 Letter, Change of Sewer Connect Required
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:49:41 PM
Creation date
1/14/2026 2:45:12 PM
Metadata
Fields
Template:
x Address Old
House Number
225
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
225 Ferndale Road North
PIN
3611823
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Telephone 473.7357 <br />CITY of ORONO <br />Post Office Box 66•Crystal Bay, Minnesota 5532:3 Municipal Offices <br />jJ <br />• J On the North Shore of Lake Minnetonka <br />October 5, 1979 <br />Mr. Jim Bruce <br />Bruce Construction Company <br />740 East Lake Street <br />Wayzata, <br />Minnesota 55391 <br />Re: 225 North Ferndale - Sewer Hookup <br />(Building Permit #4090 - Addition & Remodeling) <br />Dear Mr. Bruce: <br />On September 27, 1979, during an inspection of the above property, I <br />found it hooked up to sewer and water on Chevy Chase Drive. The owner <br />of the adjacent property explained to me that the existing hookup must <br />be discontinued when the property changes owner or is divided. In <br />checking the plans for sewer and water of the new road under construction <br />in the Northgate Subdivision, I found that stubs are to be available <br />for this property. This letter is to confirm that the existing house <br />will be connected to service in this new road. There are a number of <br />items that must be done at the time of the sewer hookup: <br />1. Sewer and water hookup permits must be obtained and the <br />$425.00 SAC charge paid prior to issuance of the sewer <br />hookup permit. <br />2. At the time of hookup, the sewer must be plugged at the <br />cleanout at the lot line and inspected. <br />3. The existing water line must have curb box removed and <br />water line plugged and inspected. <br />On October 3, 1979, the water was shut off at the curb box near the <br />rear lot line to prevent problems with vandalism. <br />If you have any questions, please contact me at 473-7357. <br />Sincerely <br />Thomas J. Jacobs <br />Building Inspector <br />TJJ:kh <br />cc: Northgate Partnership <br />Mr. Walter R. Benson, Mr. John Gerhardson, Mr. Alan Olson <br />Ms. Jeanne Mabusth, Mr. Mike Gaffron, Mr. Don Boll <br />
The URL can be used to link to this page
Your browser does not support the video tag.