My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-1986 Council Packet
Orono
>
City Council
>
1986
>
07-14-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 2:03:15 PM
Creation date
1/6/2026 1:54:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: Willow Dr. Overlay, old Crystal Bay Rd. Overlay <br />Orono, Mn. MSAP 152-101-07, 152-102-08 <br />Contractor: Wm. Mueller b Sons, Inc. <br />STATEMENT OF WORK <br />"nit <br />Item No. <br />Contract Item <br />Unit <br />Price <br />PART I - <br />WILLOW DRIVE OVERLAY <br />- MSAP 152-101-07 <br />- CONT'D <br />2554.501 <br />Traffic barrier Des. <br />A-8307 L.F. <br />$18.00 <br />2575.505 <br />Sod with 3" topsoil <br />S.Y. <br />2.80 <br />0564.603 4" wide broken line, <br />Payment No: 4 <br />File No: 13922 <br />Date: ,Tune 30. 1986 <br />Est'd Quantity Amount <br />Quantity To Date To Date <br />110 125 <br />500 <br />yellow paint <br />L.F. <br />0.051 <br />6,630 <br />0564.603 4" wide soli9 line, <br />white paint <br />L.F. <br />0.051 <br />13,260 <br />0564.603 4" wide solid line, <br />yellow paint <br />L.F. <br />0.051 <br />6,000 <br />TOTAL <br />PART I..... <br />PART II - OLD CRYSTAL BAY ROAD OVERLAY <br />- MSAP 152-102-08 <br />2101.502 <br />Clearing <br />Ea. <br />$35.00 <br />40 <br />30 <br />$1,050.00 <br />2101.507 <br />Grubbing <br />Ea. <br />35.00 <br />40 <br />30 <br />1,050.00 <br />2104.505 <br />Remove bituminous pavement <br />S.Y. <br />4.00 <br />50 <br />47 <br />188.00 <br />2104.521 <br />Salvage pipe culvert <br />L.F. <br />2.00 <br />180 <br />138 <br />276.00 <br />2105.501 <br />Ditch excavation <br />C.Y. <br />3.50 <br />1,500 <br />925 <br />3,237.50 <br />2105.525 <br />Topsoil borrow <br />C.Y. <br />14.00 <br />600 <br />29.4 <br />411.60 <br />2112.501 <br />Subgrade preparation <br />S.Y. <br />1.70 <br />450 <br />2212.501 <br />Aggregate base, (1. 5 <br />(100% crushed) <br />T. <br />9.10 <br />150 <br />150 <br />1,365.00 <br />2212.501 <br />Aggregate base C1. 5 <br />(1UO% crushed) for driveway <br />T. <br />9.10 <br />50 <br />2221.501 <br />Aggregate shoulderir., <br />Cl. 5 (100% crushes) <br />T. <br />9.10 <br />2,350 <br />2216.46 <br />20,169.79 <br />2231.501 <br />Bitum. patching mLxture <br />T. <br />55.00 <br />150 <br />83 <br />4,565.00 <br />Page 2. <br />0263d <br />
The URL can be used to link to this page
Your browser does not support the video tag.