Laserfiche WebLink
Scope of Work <br />We will descale approx 45' feet of the cast iron pipe from the <br />stack access point. This process will restore the pipe to its <br />original shape and diameter as much as possible, enhancing <br />water flow and minimizing the risk of future blockages in the <br />sewer line. <br /> <br />We will perform Hydro-Jetting from the stack access to <br />thoroughly clear the line of water and debris prior to the C.I.P.P. <br />installation. This step is critical to ensure proper adhesion of <br />the repair to the existing line and is necessary for a successful <br />and reliable installation. <br /> <br />We will install two Cured-In-Place Pipe (C.I.P.P.) repairs from <br />the home foundation to the outside clean out at approx 46' and <br />from the outside clean out to within one foot of the final joint <br />before the city main. This C.I.P.P. repair will structurally <br />reinforce the line and prevent future root intrusion. <br />