Laserfiche WebLink
ORONO HARDCOVER CALCULATION WORKSHEET <br />LAKESHORE A. Existing B. Existing C. Existing D. Proposed E. Proposed F. allowed <br />SETBACK lot area hardcover hardcover hardcover hardcover hardcover <br />ZONE in zone in zone percentage in zone percentage percentage <br />((B.A) x 1001 _(D.A) x 1001 <br />0-75' sf sf O % J sf <br />7� <br />0' 245 sf �i� sf o G►`'h� sf�in..� �o L5 `i <br />7 5-25' <br />— <br />25t - _ 00' 4 � sf �d� sf % Sdf'�-C s f 30 <br />500-1000sf sf °� sf_ r/o 35 <br />PLC <br />Directions: <br />A. Existing Lot Area in Zo.. - includes the total square footage of dry buildable land <br />within the specified zone. <br />B. Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (travel or paved) and other rain -impervious surfaces a thin the specified zone. <br />C. Existing Hardcover Percentage - divide the number in B by the number in A and multiply by i 0. <br />D. Proposed Har'^over in Zone. - includes the existing hardcover plus all proposed additional <br />hardcover. <br />E. Proposed Hardcover Percen'.a^es - divide the number in D by the number in A and multiply by <br />F. Allowed Hardcover Percent-g-s - if the percentages in column E for any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Department at 473-7357 <br />to discuss the possibilities of obtaining a variance. Generally, if a concurrent removal <br />of existing hardcover matches the additional hardcover proposed, resulting in no net increase <br />of hardcover in a specified zone, a variance may not be necessary. <br />#1033 <br />